CLR (Computerization of Land Records) - Physical Progress

State/UT: RAJASTHAN
District: HANUMANGARH
Tehsil Name: Hanumangarh
S.No. Village Name Total No. of ROR Total No. of Land Owners/ Holders ROR Data Entry as of Previous settlement (100% checked and frozen) Availability of ROR Distribution/Printing Software ROR Linkage With Aadhaar No. of Land Owners/ Holders whose ROR is linked with Aadhaar Whether Mutation notice and Mutation Workflow are Computerized Issuance of Digitally Signed ROR Status Entry Date
Completed Ongoing Not Started
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
1 10 DLP 124 511 Completed Done 0 0 124 0 Done Done 2024-01-19
2 10 HMH 307 549 Completed Done 0 0 307 0 Done Done 2024-04-25
3 10 JDW 151 475 Completed Done 0 0 151 0 Done Done 2024-04-26
4 10 JRK 187 459 Completed Done 0 0 187 0 Done Done 2024-04-23
5 10 KSP 163 336 Completed Done 0 0 163 0 Done Done 2024-04-25
6 10 LLW 155 560 Completed Done 0 0 155 0 Done Done 2024-04-23
7 10 MD-A 59 99 Completed Done 0 0 59 0 Done Done 2024-01-23
8 10 MD-B 46 106 Completed Done 0 0 46 0 Done Done 2024-02-06
9 10 MD-C 53 102 Completed Done 0 0 53 0 Done Done 2024-01-23
10 10 MMK 91 444 Completed Done 0 0 91 0 Done Done 2024-04-23
11 10 MOD 142 375 Completed Done 0 0 142 0 Done Done 2024-01-30
12 10 MWM 70 184 Completed Done 0 0 70 0 Done Done 2024-04-28
13 10 MZW 169 351 Completed Done 0 0 169 0 Done Done 2024-04-28
14 10 NDR 90 148 Completed Done 0 0 90 0 Done Done 2024-04-28
15 10 RP-A 40 225 Completed Done 0 0 40 0 Done Done 2024-01-30
16 10 RP-B 39 271 Completed Done 0 0 39 0 Done Done 2024-01-30
17 10 SSW-A 173 304 Completed Done 0 0 173 0 Done Done 2024-04-25
18 10 SSW-B 193 359 Completed Done 0 0 193 0 Done Done 2024-04-25
19 10 STG 139 381 Completed Done 0 0 139 0 Done Done 2024-04-26
20 11 DLP 112 447 Completed Done 0 0 112 0 Done Done 2024-02-01
21 11 HMH 114 343 Completed Done 0 0 114 0 Done Done 2024-04-25
22 11 JDW 73 238 Completed Done 0 0 73 0 Done Done 2024-04-23
23 11 JRK 167 572 Completed Done 0 0 167 0 Done Done 2024-04-26
24 11 KSP 168 438 Completed Done 0 0 168 0 Done Done 2024-04-25
25 11 LLW 161 493 Completed Done 0 0 161 0 Done Done 2024-04-23
26 11 MD 101 240 Completed Done 0 0 101 0 Done Done 2024-02-01
27 11 MMK 102 376 Completed Done 0 0 102 0 Done Done 2024-04-23
28 11 NDR 107 215 Completed Done 0 0 107 0 Done Done 2024-04-28
29 11 RP 65 200 Completed Done 0 0 65 0 Done Done 2024-02-01
30 11 SSW 2 2 Completed Done 0 0 2 0 Done Done 2024-04-25
31 11 STG 161 364 Completed Done 0 0 161 0 Done Done 2024-04-26
32 12 HMH 197 387 Completed Done 0 0 197 0 Done Done 2024-04-25
33 12 JDW 143 554 Completed Done 0 0 143 0 Done Done 2024-04-26
34 12 JRK 166 408 Completed Done 0 0 166 0 Done Done 2024-04-26
35 12 KSP-A 2 1 Completed Done 0 0 2 0 Done Done 2024-02-01
36 12 KSP-B 3 2 Completed Done 0 0 3 0 Done Done 2024-02-01
37 12 LLW 197 512 Completed Done 0 0 197 0 Done Done 2024-04-23
38 12 MD 71 229 Completed Done 0 0 71 0 Done Done 2024-02-01
39 12 MMK 72 626 Completed Done 0 0 72 0 Done Done 2024-02-01
40 12 NDR-A 49 110 Completed Done 0 0 49 0 Done Done 2024-02-01
41 12 NDR-B 76 117 Completed Done 0 0 76 0 Done Done 2024-02-01
42 12 RP 67 258 Completed Done 0 0 67 0 Done Done 2024-02-01
43 12 STG 161 384 Completed Done 0 0 161 0 Done Done 2024-04-25
44 13 HMH (RURAL) 109 271 Completed Done 0 0 109 0 Done Done 2024-04-25
45 13 JDW 146 454 Completed Done 0 0 146 0 Done Done 2024-02-01
46 13 JRK 109 453 Completed Done 0 0 109 0 Done Done 2024-04-26
47 13 KSP-A 56 140 Completed Done 0 0 56 0 Done Done 2024-02-01
48 13 KSP-B 100 230 Completed Done 0 0 100 0 Done Done 2024-02-01
49 13 LLW 146 454 Completed Done 0 0 146 0 Done Done 2024-04-23
50 13 MD 75 218 Completed Done 0 0 75 0 Done Done 2024-02-01
51 13 MMK 106 531 Completed Done 0 0 106 0 Done Done 2024-04-23
52 13 NDR 159 490 Completed Done 0 0 159 0 Done Done 2024-04-28
53 13 RP 96 324 Completed Done 0 0 96 0 Done Done 2024-02-01
54 13 SSW 2 2 Completed Done 0 0 2 0 Done Done 2024-04-25
55 13 STG 125 347 Completed Done 0 0 125 0 Done Done 2024-04-26
56 14 AG 93 208 Completed Done 0 0 93 0 Done Done 2024-02-01
57 14 HMH (RURAL) 232 424 Completed Done 0 0 232 0 Done Done 2024-04-25
58 14 JDW 192 537 Completed Done 0 0 192 0 Done Done 2024-04-23
59 14 JRK-A 173 665 Completed Done 0 0 173 0 Done Done 2024-04-26
60 14 JRK-B 118 297 Completed Done 0 0 118 0 Done Done 2024-04-26
61 14 KSP 144 317 Completed Done 0 0 144 0 Done Done 2024-02-01
62 14 LLW 252 481 Completed Done 0 0 252 0 Done Done 2024-04-23
63 14 MD 77 207 Completed Done 0 0 77 0 Done Done 2024-02-01
64 14 MMK 107 549 Completed Done 0 0 107 0 Done Done 2024-04-23
65 14 MWM 60 182 Completed Done 0 0 60 0 Done Done 2024-04-25
66 14 NDR-CAD 40 93 Completed Done 0 0 40 0 Done Done 2024-04-28
67 14 NDR-CAD (RAHIT) 148 407 Completed Done 0 0 148 0 Done Done 2024-04-28
68 14 SSW 471 907 Completed Done 0 0 471 0 Done Done 2024-04-25
69 14 STG 164 392 Completed Done 0 0 164 0 Done Done 2024-04-26
70 15 AG 153 291 Completed Done 0 0 153 0 Done Done 2024-04-28
71 15 HMH (RURAL) 187 416 Completed Done 0 0 187 0 Done Done 2024-04-25
72 15 JDW 222 700 Completed Done 0 0 222 0 Done Done 2024-04-23
73 15 JRK 164 468 Completed Done 0 0 164 0 Done Done 2024-04-26
74 15 KSP 2 1 Completed Done 0 0 2 0 Done Done 2024-02-01
75 15 LLW-A 103 221 Completed Done 0 0 103 0 Done Done 2024-04-23
76 15 LLW-B 85 205 Completed Done 0 0 85 0 Done Done 2024-02-01
77 15 MD 112 225 Completed Done 0 0 112 0 Done Done 2024-02-01
78 15 MMK 133 686 Completed Done 0 0 133 0 Done Done 2024-04-23
79 15 NDR-A 57 109 Completed Done 0 0 57 0 Done Done 2024-02-01
80 15 NDR-B 62 188 Completed Done 0 0 62 0 Done Done 2024-02-01
81 15 RP 165 498 Completed Done 0 0 165 0 Done Done 2024-02-01
82 15 SSW-A 2 2 Completed Done 0 0 2 0 Done Done 2024-04-25
83 15 SSW-B 3 3 Completed Done 0 0 3 0 Done Done 2024-04-25
84 15 STG-A 128 389 Completed Done 0 0 128 0 Done Done 2024-04-26
85 15 STG-B 68 225 Completed Done 0 0 68 0 Done Done 2024-04-26
86 16 AG 94 147 Completed Done 0 0 94 0 Done Done 2024-04-28
87 16 HMH (RURAL) 201 395 Completed Done 0 0 201 0 Done Done 2024-04-25
88 16 JRK 237 764 Completed Done 0 0 237 0 Done Done 2024-04-26
89 16 KSP 217 537 Completed Done 0 0 217 0 Done Done 2024-04-25
90 16 LLW-A 136 319 Completed Done 0 0 136 0 Done Done 2024-04-23
91 16 LLW-B 78 205 Completed Done 0 0 78 0 Done Done 2024-02-01
92 16 MD 158 387 Completed Done 0 0 158 0 Done Done 2024-02-01
93 16 MMK 119 453 Completed Done 0 0 119 0 Done Done 2024-04-23
94 16 NDR 137 353 Completed Done 0 0 137 0 Done Done 2024-04-28
95 16 SSW 308 538 Completed Done 0 0 308 0 Done Done 2024-04-25
96 16 STG 179 423 Completed Done 0 0 179 0 Done Done 2024-04-26
97 17 AG 78 121 Completed Done 0 0 78 0 Done Done 2024-04-28
98 17 HMH (RURAL) 228 523 Completed Done 0 0 228 0 Done Done 2024-04-25
99 17 KSP 122 354 Completed Done 0 0 122 0 Done Done 2024-04-25
100 17 LLW 246 678 Completed Done 0 0 246 0 Done Done 2024-04-23
101 17 MMK 119 454 Completed Done 0 0 119 0 Done Done 2024-02-01
102 17 NDR 69 159 Completed Done 0 0 69 0 Done Done 2024-04-28
103 17 SSW 2 2 Completed Done 0 0 2 0 Done Done 2024-04-25
104 17 STG 216 504 Completed Done 0 0 216 0 Done Done 2024-04-26
105 18 AG 141 236 Completed Done 0 0 141 0 Done Done 2024-04-28
106 18 HMH (RURAL) 244 525 Completed Done 0 0 244 0 Done Done 2024-04-25
107 18 KSP 243 661 Completed Done 0 0 243 0 Done Done 2024-04-25
108 18 LLW-A 141 363 Completed Done 0 0 141 0 Done Done 2024-02-01
109 18 LLW-B 112 288 Completed Done 0 0 112 0 Done Done 2024-04-23
110 18 MMK 112 732 Completed Done 0 0 112 0 Done Done 2024-04-23
111 18 NDR 135 341 Completed Done 0 0 135 0 Done Done 2024-02-01
112 18 SSW 174 395 Completed Done 0 0 174 0 Done Done 2024-04-25
113 18 STG 160 374 Completed Done 0 0 160 0 Done Done 2024-02-01
114 19 AG 103 174 Completed Done 0 0 103 0 Done Done 2024-04-28
115 19 HMH 187 437 Completed Done 0 0 187 0 Done Done 2024-04-25
116 19 JRK 387 1012 Completed Done 0 0 387 0 Done Done 2024-04-23
117 19 KSP (KISHANPURA) 134 361 Completed Done 0 0 134 0 Done Done 2024-04-25
118 19 LLW 117 335 Completed Done 0 0 117 0 Done Done 2024-04-23
119 19 MMK 147 481 Completed Done 0 0 147 0 Done Done 2024-04-23
120 19 NDR 78 183 Completed Done 0 0 78 0 Done Done 2024-04-25
121 19 SSW 139 296 Completed Done 0 0 139 0 Done Done 2024-04-25
122 19 STG 157 314 Completed Done 0 0 157 0 Done Done 2024-04-26
123 1 ARW 73 184 Completed Done 0 0 73 0 Done Done 2024-04-26
124 1 AWSM 82 261 Completed Done 0 0 82 0 Done Done 2024-04-25
125 1 BPM 112 246 Completed Done 0 0 112 0 Done Done 2024-04-28
126 1 BPSM 100 151 Completed Done 0 0 100 0 Done Done 2024-04-28
127 1 C 59 257 Completed Done 0 0 59 0 Done Done 2024-04-25
128 1 CS 85 224 Completed Done 0 0 85 0 Done Done 2024-04-25
129 1 DBL-A 204 503 Completed Done 0 0 204 0 Done Done 2024-04-26
130 1 DBL-B 231 564 Completed Done 0 0 231 0 Done Done 2024-04-26
131 1 JDW 91 264 Completed Done 0 0 91 0 Done Done 2024-04-16
132 1 JRK 140 320 Completed Done 0 0 140 0 Done Done 2024-02-01
133 1 KKW 172 628 Completed Done 0 0 172 0 Done Done 2024-04-16
134 1 KNJ (RURAL) 4 3 Completed Done 0 0 4 0 Done Done 2024-02-01
135 1 KWD 37 160 Completed Done 0 0 37 0 Done Done 2024-02-01
136 1 KWM 34 162 Completed Done 0 0 34 0 Done Done 2024-02-01
137 1 LGW 175 488 Completed Done 0 0 175 0 Done Done 2024-04-26
138 1 LK 50 189 Completed Done 0 0 50 0 Done Done 2024-02-01
139 1 M 84 192 Completed Done 0 0 84 0 Done Done 2024-04-28
140 1 MOD 168 452 Completed Done 0 0 168 0 Done Done 2024-04-16
141 1 MW 71 155 Completed Done 0 0 71 0 Done Done 2024-02-01
142 1 MWM 54 179 Completed Done 0 0 54 0 Done Done 2024-04-28
143 1 NWN 84 253 Completed Done 0 0 84 0 Done Done 2024-04-25
144 1 R 101 356 Completed Done 0 0 101 0 Done Done 2024-04-26
145 1 RP 49 90 Completed Done 0 0 49 0 Done Done 2024-04-28
146 1 SNM 46 93 Completed Done 0 0 46 0 Done Done 2024-04-25
147 1 STB 63 281 Completed Done 0 0 63 0 Done Done 2024-02-01
148 1 STD 42 296 Completed Done 0 0 42 0 Done Done 2024-04-16
149 1 STG (RURAL) 125 277 Completed Done 0 0 125 0 Done Done 2024-04-16
150 1 UTS 140 453 Completed Done 0 0 140 0 Done Done 2024-04-23
151 1 ZWD 78 354 Completed Done 0 0 78 0 Done Done 2024-02-01
152 20 AG 130 232 Completed Done 0 0 130 0 Done Done 2024-04-28
153 20 HMH 403 1087 Completed Done 0 0 403 0 Done Done 2024-04-25
154 20 KSP 192 508 Completed Done 0 0 192 0 Done Done 2024-02-01
155 20 LLW 103 367 Completed Done 0 0 103 0 Done Done 2024-04-23
156 20 MMK 91 393 Completed Done 0 0 91 0 Done Done 2024-04-23
157 20 NDR-A 56 158 Completed Done 0 0 56 0 Done Done 2024-02-01
158 20 NDR-B 108 334 Completed Done 0 0 108 0 Done Done 2024-04-28
159 20 SSW 163 418 Completed Done 0 0 163 0 Done Done 2024-04-25
160 20 STG 156 388 Completed Done 0 0 156 0 Done Done 2024-04-26
161 21 AG 223 408 Completed Done 0 0 223 0 Done Done 2024-04-28
162 21 HMH-A 131 300 Completed Done 0 0 131 0 Done Done 2024-04-25
163 21 HMH-B 105 228 Completed Done 0 0 105 0 Done Done 2024-04-25
164 21 KSP 127 314 Completed Done 0 0 127 0 Done Done 2024-02-01
165 21 LLW 126 460 Completed Done 0 0 126 0 Done Done 2024-04-23
166 21 MMK 142 451 Completed Done 0 0 142 0 Done Done 2024-04-23
167 21 NDR 122 257 Completed Done 0 0 122 0 Done Done 2024-02-01
168 21 SSW 86 245 Completed Done 0 0 86 0 Done Done 2024-04-25
169 22 HMH 413 923 Completed Done 0 0 413 0 Done Done 2024-04-25
170 22 KSP 117 274 Completed Done 0 0 117 0 Done Done 2024-04-25
171 22 LLW-A 79 244 Completed Done 0 0 79 0 Done Done 2024-02-01
172 22 LLW-B 98 303 Completed Done 0 0 98 0 Done Done 2024-02-01
173 22 MJD 174 494 Completed Done 0 0 174 0 Done Done 2024-04-23
174 22 MMK 137 504 Completed Done 0 0 137 0 Done Done 2024-04-23
175 22 NDR 83 253 Completed Done 0 0 83 0 Done Done 2024-04-25
176 22 SSW 190 470 Completed Done 0 0 190 0 Done Done 2024-04-25
177 23 HMH 204 478 Completed Done 0 0 204 0 Done Done 2024-04-25
178 23 KSP 123 310 Completed Done 0 0 123 0 Done Done 2024-04-25
179 23 LLW 146 547 Completed Done 0 0 146 0 Done Done 2024-04-23
180 23 MJD 101 387 Completed Done 0 0 101 0 Done Done 2024-04-23
181 23 MMK 99 362 Completed Done 0 0 99 0 Done Done 2024-02-01
182 23 NDR 75 203 Completed Done 0 0 75 0 Done Done 2024-02-01
183 23 SSW 201 415 Completed Done 0 0 201 0 Done Done 2024-04-25
184 24 KSP 144 319 Completed Done 0 0 144 0 Done Done 2024-04-25
185 24 LLW-A 101 460 Completed Done 0 0 101 0 Done Done 2024-02-01
186 24 LLW-B 138 465 Completed Done 0 0 138 0 Done Done 2024-04-23
187 24 MMK 120 463 Completed Done 0 0 120 0 Done Done 2024-02-01
188 24 NDR 117 274 Completed Done 0 0 117 0 Done Done 2024-04-25
189 24 SSW 146 498 Completed Done 0 0 146 0 Done Done 2024-04-25
190 25 KSP 118 372 Completed Done 0 0 118 0 Done Done 2024-04-25
191 25 LLW 161 593 Completed Done 0 0 161 0 Done Done 2024-02-02
192 25 MMK 155 727 Completed Done 0 0 155 0 Done Done 2024-04-24
193 25 NDR-A 103 231 Completed Done 0 0 103 0 Done Done 2024-02-02
194 25 NDR-B 70 123 Completed Done 0 0 70 0 Done Done 2024-02-02
195 25 SSW 187 371 Completed Done 0 0 187 0 Done Done 2024-04-25
196 26 LLW 122 312 Completed Done 0 0 122 0 Done Done 2024-02-02
197 26 NDR-A 57 183 Completed Done 0 0 57 0 Done Done 2024-04-25
198 26 NDR-B 58 274 Completed Done 0 0 58 0 Done Done 2024-04-25
199 26 SSW 142 386 Completed Done 0 0 142 0 Done Done 2024-04-25
200 27 LLW 156 384 Completed Done 0 0 156 0 Done Done 2024-02-02
201 27 MMK 118 464 Completed Done 0 0 118 0 Done Done 2024-02-02
202 27 NDR 86 232 Completed Done 0 0 86 0 Done Done 2024-04-25
203 28 LLW 128 324 Completed Done 0 0 128 0 Done Done 2024-02-02
204 28 MMK 117 427 Completed Done 0 0 117 0 Done Done 2024-02-02
205 28 NDR 42 122 Completed Done 0 0 42 0 Done Done 2024-04-25
206 28 SSW 156 338 Completed Done 0 0 156 0 Done Done 2024-04-25
207 29 LLW 166 402 Completed Done 0 0 166 0 Done Done 2024-02-02
208 29 MMK 106 378 Completed Done 0 0 106 0 Done Done 2024-02-02
209 29 NDR 101 351 Completed Done 0 0 101 0 Done Done 2024-04-25
210 29 SSW 81 248 Completed Done 0 0 81 0 Done Done 2024-04-25
211 2 AM 75 150 Completed Done 0 0 75 0 Done Done 2024-02-02
212 2 ARW 43 143 Completed Done 0 0 43 0 Done Done 2024-04-25
213 2 AWSM 68 192 Completed Done 0 0 68 0 Done Done 2024-02-02
214 2 C 31 61 Completed Done 0 0 31 0 Done Done 2024-04-25
215 2 DBL 203 501 Completed Done 0 0 203 0 Done Done 2024-04-26
216 2 HLM 54 145 Completed Done 0 0 54 0 Done Done 2024-04-28
217 2 HMH 206 375 Completed Done 0 0 206 0 Done Done 2024-04-25
218 2 JDW 118 208 Completed Done 0 0 118 0 Done Done 2024-02-02
219 2 JRK 166 423 Completed Done 0 0 166 0 Done Done 2024-04-23
220 2 KKW 116 331 Completed Done 0 0 116 0 Done Done 2024-02-02
221 2 KNJ 400 968 Completed Done 0 0 400 0 Done Done 2024-04-23
222 2 KWM 57 197 Completed Done 0 0 57 0 Done Done 2024-02-02
223 2 LK 36 244 Completed Done 0 0 36 0 Done Done 2024-02-02
224 2 M 105 294 Completed Done 0 0 105 0 Done Done 2024-02-02
225 2 MOD-A 167 456 Completed Done 0 0 167 0 Done Done 2024-04-26
226 2 MOD-B 173 473 Completed Done 0 0 173 0 Done Done 2024-04-26
227 2 MW 63 161 Completed Done 0 0 63 0 Done Done 2024-02-02
228 2 MWM-A 81 166 Completed Done 0 0 81 0 Done Done 2024-04-28
229 2 MWM-B 82 148 Completed Done 0 0 82 0 Done Done 2024-04-28
230 2 NWN (RURAL) 100 175 Completed Done 0 0 100 0 Done Done 2024-02-02
231 2 PBN 236 556 Completed Done 0 0 236 0 Done Done 2024-04-26
232 2 R 98 203 Completed Done 0 0 98 0 Done Done 2024-04-26
233 2 RRW 247 901 Completed Done 0 0 247 0 Done Done 2024-04-23
234 2 SNM (RURAL) 178 355 Completed Done 0 0 178 0 Done Done 2024-04-25
235 2 SSW 84 220 Completed Done 0 0 84 0 Done Done 2024-04-25
236 2 STD 30 49 Completed Done 0 0 30 0 Done Done 2024-04-23
237 2 STG 195 446 Completed Done 0 0 195 0 Done Done 2024-04-23
238 2 UMW 110 274 Completed Done 0 0 110 0 Done Done 2024-02-02
239 30 LLW 179 559 Completed Done 0 0 179 0 Done Done 2024-04-24
240 30 MMK 137 767 Completed Done 0 0 137 0 Done Done 2024-04-24
241 30 NDR 82 256 Completed Done 0 0 82 0 Done Done 2024-04-25
242 30 SSW 137 361 Completed Done 0 0 137 0 Done Done 2024-04-25
243 31 LLW 87 289 Completed Done 0 0 87 0 Done Done 2024-04-24
244 31 MMK 126 459 Completed Done 0 0 126 0 Done Done 2024-02-05
245 31 NDR 71 169 Completed Done 0 0 71 0 Done Done 2024-04-25
246 31 SSW (FATEHGARH) 179 312 Completed Done 0 0 179 0 Done Done 2024-04-25
247 32 LLW 213 492 Completed Done 0 0 213 0 Done Done 2024-04-24
248 32 MMK 163 694 Completed Done 0 0 163 0 Done Done 2024-04-24
249 32 NDR 83 324 Completed Done 0 0 83 0 Done Done 2024-04-26
250 32 SSW 111 231 Completed Done 0 0 111 0 Done Done 2024-04-25
251 33 MMK 102 490 Completed Done 0 0 102 0 Done Done 2024-04-24
252 33 SSW 151 372 Completed Done 0 0 151 0 Done Done 2024-04-26
253 34 SSW 125 304 Completed Done 0 0 125 0 Done Done 2024-04-26
254 35 NDR 81 346 Completed Done 0 0 81 0 Done Done 2024-04-26
255 35 SSW 199 605 Completed Done 0 0 199 0 Done Done 2024-04-26
256 36 SSW 135 321 Completed Done 0 0 135 0 Done Done 2024-04-26
257 37 NGC 99 517 Completed Done 0 0 99 0 Done Done 2024-04-24
258 37 SSW 168 438 Completed Done 0 0 168 0 Done Done 2024-04-26
259 38 NGC 145 487 Completed Done 0 0 145 0 Done Done 2024-04-24
260 38 SSW 2 2 Completed Done 0 0 2 0 Done Done 2024-04-26
261 39 NGC 107 295 Completed Done 0 0 107 0 Done Done 2024-04-24
262 39 SSW 155 448 Completed Done 0 0 155 0 Done Done 2024-04-26
263 3 ARW 109 306 Completed Done 0 0 109 0 Done Done 2024-04-25
264 3 AWSM-A 65 168 Completed Done 0 0 65 0 Done Done 2024-04-25
265 3 AWSM-B 52 133 Completed Done 0 0 52 0 Done Done 2024-04-25
266 3 BPM 110 194 Completed Done 0 0 110 0 Done Done 2024-04-28
267 3 BPSM 90 160 Completed Done 0 0 90 0 Done Done 2024-04-28
268 3 DBL 178 436 Completed Done 0 0 178 0 Done Done 2024-04-26
269 3 HLM 38 120 Completed Done 0 0 38 0 Done Done 2024-04-28
270 3 JDW 165 498 Completed Done 0 0 165 0 Done Done 2024-04-24
271 3 JRK 122 377 Completed Done 0 0 122 0 Done Done 2024-04-24
272 3 KKW-A 91 359 Completed Done 0 0 91 0 Done Done 2024-02-05
273 3 KKW-B 57 152 Completed Done 0 0 57 0 Done Done 2024-02-05
274 3 KNJ (RURAL) 289 575 Completed Done 0 0 289 0 Done Done 2024-04-24
275 3 KWM 74 244 Completed Done 0 0 74 0 Done Done 2024-04-25
276 3 LK 86 341 Completed Done 0 0 86 0 Done Done 2024-02-05
277 3 MOD 171 504 Completed Done 0 0 171 0 Done Done 2024-04-26
278 3 MW 82 131 Completed Done 0 0 82 0 Done Done 2024-02-05
279 3 MWM 69 186 Completed Done 0 0 69 0 Done Done 2024-04-28
280 3 NWN 18 27 Completed Done 0 0 18 0 Done Done 2024-02-05
281 3 PBN 169 439 Completed Done 0 0 169 0 Done Done 2024-04-26
282 3 RP 56 141 Completed Done 0 0 56 0 Done Done 2024-04-28
283 3 RRW-A 202 795 Completed Done 0 0 202 0 Done Done 2024-04-24
284 3 RRW-B 178 489 Completed Done 0 0 178 0 Done Done 2024-04-24
285 3 SNM 145 354 Completed Done 0 0 145 0 Done Done 2024-04-25
286 3 STD 189 576 Completed Done 0 0 189 0 Done Done 2024-04-24
287 3 STG 110 433 Completed Done 0 0 110 0 Done Done 2024-04-24
288 3 UMW-A 59 257 Completed Done 0 0 59 0 Done Done 2024-04-24
289 3 UMW-B 67 273 Completed Done 0 0 67 0 Done Done 2024-04-24
290 3 UTS 176 567 Completed Done 0 0 176 0 Done Done 2024-04-24
291 40 NGC 93 282 Completed Done 0 0 93 0 Done Done 2024-04-25
292 40 SSW 125 290 Completed Done 0 0 125 0 Done Done 2024-04-26
293 41 NGC 119 448 Completed Done 0 0 119 0 Done Done 2024-04-25
294 41 SSW 188 617 Completed Done 0 0 188 0 Done Done 2024-04-26
295 42 NGC 110 333 Completed Done 0 0 110 0 Done Done 2024-04-25
296 42 SSW 196 535 Completed Done 0 0 196 0 Done Done 2024-04-26
297 43 NGC 111 256 Completed Done 0 0 111 0 Done Done 2024-04-25
298 43 SSW 173 505 Completed Done 0 0 173 0 Done Done 2024-04-26
299 44 NGC (RURAL) 199 533 Completed Done 0 0 199 0 Done Done 2024-04-25
300 44 SSW 115 290 Completed Done 0 0 115 0 Done Done 2024-04-26
301 45 NGC 109 325 Completed Done 0 0 109 0 Done Done 2024-04-25
302 45 SSW 159 417 Completed Done 0 0 159 0 Done Done 2024-04-26
303 46 NGC (RURAL) 153 307 Completed Done 0 0 153 0 Done Done 2024-04-25
304 47 NGC (RURAL) 187 351 Completed Done 0 0 187 0 Done Done 2024-04-25
305 48 NGC (RURAL) 216 497 Completed Done 0 0 216 0 Done Done 2024-04-25
306 49 NGC (RURAL) 237 525 Completed Done 0 0 237 0 Done Done 2024-04-25
307 4 ARW 113 283 Completed Done 0 0 113 0 Done Done 2024-04-26
308 4 ARW-A 91 237 Completed Done 0 0 91 0 Done Done 2024-04-26
309 4 AWSM 143 343 Completed Done 0 0 143 0 Done Done 2024-04-25
310 4 HLM 86 153 Completed Done 0 0 86 0 Done Done 2024-04-28
311 4 HLM-A 62 147 Completed Done 0 0 62 0 Done Done 2024-04-28
312 4 JDW 87 229 Completed Done 0 0 87 0 Done Done 2024-04-25
313 4 JRK 124 457 Completed Done 0 0 124 0 Done Done 2024-04-24
314 4 KKW 132 278 Completed Done 0 0 132 0 Done Done 2024-04-24
315 4 LK 45 218 Completed Done 0 0 45 0 Done Done 2023-07-04
316 4 MOD 336 1040 Completed Done 0 0 336 0 Done Done 2024-04-26
317 4 MW 98 180 Completed Done 0 0 98 0 Done Done 2023-07-04
318 4 MWM-A 95 191 Completed Done 0 0 95 0 Done Done 2024-04-28
319 4 MWM-B 56 92 Completed Done 0 0 56 0 Done Done 2024-04-28
320 4 PBN 149 445 Completed Done 0 0 149 0 Done Done 2024-04-26
321 4 RRW 318 809 Completed Done 0 0 318 0 Done Done 2024-04-24
322 4 SNM 100 192 Completed Done 0 0 100 0 Done Done 2024-04-25
323 4 SSW 98 199 Completed Done 0 0 98 0 Done Done 2024-04-25
324 4 STG 189 669 Completed Done 0 0 189 0 Done Done 2024-04-24
325 4 UTS 57 339 Completed Done 0 0 57 0 Done Done 2024-04-25
326 50 NGC (RURAL) 231 540 Completed Done 0 0 231 0 Done Done 2024-04-25
327 51 NGC (RURAL) 225 533 Completed Done 0 0 225 0 Done Done 2024-04-25
328 55/56 RD 34 130 Completed Done 0 0 34 0 Done Done 2023-07-04
329 5 ARW-A 53 105 Completed Done 0 0 53 0 Done Done 2024-04-26
330 5 ARW-B 32 69 Completed Done 0 0 32 0 Done Done 2023-07-04
331 5 AWSM 63 118 Completed Done 0 0 63 0 Done Done 2024-04-25
332 5 HMH 195 475 Completed Done 0 0 195 0 Done Done 2024-04-25
333 5 JDW 136 310 Completed Done 0 0 136 0 Done Done 2024-04-25
334 5 JRK 124 286 Completed Done 0 0 124 0 Done Done 2023-07-04
335 5 KKW 112 265 Completed Done 0 0 112 0 Done Done 2024-04-25
336 5 KNJ 193 501 Completed Done 0 0 193 0 Done Done 2024-04-25
337 5 LK 60 166 Completed Done 0 0 60 0 Done Done 2023-07-04
338 5 LLW 135 715 Completed Done 0 0 135 0 Done Done 2024-04-25
339 5 MD 88 214 Completed Done 0 0 88 0 Done Done 2023-07-04
340 5 MOD 132 305 Completed Done 0 0 132 0 Done Done 2024-04-26
341 5 MW 123 287 Completed Done 0 0 123 0 Done Done 2023-07-04
342 5 MWM-A (MAINAWALI) 77 131 Completed Done 0 0 77 0 Done Done 2023-07-04
343 5 MWM-B 121 249 Completed Done 0 0 121 0 Done Done 2024-04-28
344 5 RP 105 235 Completed Done 0 0 105 0 Done Done 2024-04-28
345 5 SSW (JHAMBAR) 163 499 Completed Done 0 0 163 0 Done Done 2024-04-25
346 5 UTS 80 274 Completed Done 0 0 80 0 Done Done 2024-04-25
347 6 HMH 171 391 Completed Done 0 0 171 0 Done Done 2024-04-25
348 6 JDW 208 499 Completed Done 0 0 208 0 Done Done 2024-04-25
349 6 JRK 198 379 Completed Done 0 0 198 0 Done Done 2024-04-25
350 6 KKW 231 835 Completed Done 0 0 231 0 Done Done 2024-04-25
351 6 LLW 126 476 Completed Done 0 0 126 0 Done Done 2024-04-25
352 6 MD-A 77 151 Completed Done 0 0 77 0 Done Done 2023-07-04
353 6 MD-B 77 129 Completed Done 0 0 77 0 Done Done 2023-07-04
354 6 MOD 232 801 Completed Done 0 0 232 0 Done Done 2024-04-26
355 6 MWM-A 72 146 Completed Done 0 0 72 0 Done Done 2024-04-28
356 6 MWM-B 68 199 Completed Done 0 0 68 0 Done Done 2024-04-28
357 6 RP 114 233 Completed Done 0 0 114 0 Done Done 2024-04-28
358 6 SNM 172 322 Completed Done 0 0 172 0 Done Done 2024-04-25
359 6 SSW 212 530 Completed Done 0 0 212 0 Done Done 2024-04-25
360 6 STG 280 680 Completed Done 0 0 280 0 Done Done 2024-04-25
361 6 UTS 101 409 Completed Done 0 0 101 0 Done Done 2024-04-25
362 7 DLP 114 430 Completed Done 0 0 114 0 Done Done 2024-04-25
363 7 HMH 185 388 Completed Done 0 0 185 0 Done Done 2024-04-25
364 7 JDW 147 468 Completed Done 0 0 147 0 Done Done 2024-04-25
365 7 JRK 162 386 Completed Done 0 0 162 0 Done Done 2024-04-26
366 7 LLW 110 405 Completed Done 0 0 110 0 Done Done 2024-04-25
367 7 MD 122 213 Completed Done 0 0 122 0 Done Done 2023-07-04
368 7 MOD 187 651 Completed Done 0 0 187 0 Done Done 2024-04-26
369 7 MWM 112 278 Completed Done 0 0 112 0 Done Done 2024-04-28
370 7 NDR-A 117 311 Completed Done 0 0 117 0 Done Done 2023-07-04
371 7 NDR-B 115 329 Completed Done 0 0 115 0 Done Done 2023-07-04
372 7 RP-A 108 265 Completed Done 0 0 108 0 Done Done 2024-04-28
373 7 RP-B 49 139 Completed Done 0 0 49 0 Done Done 2024-04-28
374 7 RPC 116 309 Completed Done 0 0 116 0 Done Done 2024-04-28
375 7 SNM 166 420 Completed Done 0 0 166 0 Done Done 2024-04-25
376 7 SSW 179 465 Completed Done 0 0 179 0 Done Done 2024-04-25
377 7 STG 235 681 Completed Done 0 0 235 0 Done Done 2024-04-26
378 7 UTS 106 436 Completed Done 0 0 106 0 Done Done 2024-04-25
379 8 DLP 59 387 Completed Done 0 0 59 0 Done Done 2024-04-25
380 8 HMH 122 215 Completed Done 0 0 122 0 Done Done 2024-04-25
381 8 JRK 204 536 Completed Done 0 0 204 0 Done Done 2024-04-26
382 8 KSP 104 210 Completed Done 0 0 104 0 Done Done 2023-07-04
383 8 LLW 106 534 Completed Done 0 0 106 0 Done Done 2024-04-25
384 8 MD 127 288 Completed Done 0 0 127 0 Done Done 2023-07-04
385 8 MOD 163 572 Completed Done 0 0 163 0 Done Done 2024-04-26
386 8 MWM 84 165 Completed Done 0 0 84 0 Done Done 2024-04-28
387 8 NDR 69 197 Completed Done 0 0 69 0 Done Done 2024-04-28
388 8 RP-CAD(RAHIT) 58 163 Completed Done 0 0 58 0 Done Done 2024-04-28
389 8 RP-CAD(SAHIT) 110 424 Completed Done 0 0 110 0 Done Done 2024-04-28
390 8 SSW 476 1113 Completed Done 0 0 476 0 Done Done 2024-04-25
391 8 STG-A 135 432 Completed Done 0 0 135 0 Done Done 2024-04-26
392 8 STG-B 224 717 Completed Done 0 0 224 0 Done Done 2024-04-26
393 9 DLP 10 601 Completed Done 0 0 10 0 Done Done 2024-04-25
394 9 HMH 119 269 Completed Done 0 0 119 0 Done Done 2024-04-25
395 9 JDW 124 437 Completed Done 0 0 124 0 Done Done 2024-04-25
396 9 JRK 134 383 Completed Done 0 0 134 0 Done Done 2024-04-26
397 9 LLW 143 373 Completed Done 0 0 143 0 Done Done 2024-04-25
398 9 MD 135 347 Completed Done 0 0 135 0 Done Done 2023-07-04
399 9 MOD 144 555 Completed Done 0 0 144 0 Done Done 2024-04-26
400 9 MWM 78 206 Completed Done 0 0 78 0 Done Done 2024-04-25
401 9 MZW 81 159 Completed Done 0 0 81 0 Done Done 2024-04-28
402 9 NDR 95 273 Completed Done 0 0 95 0 Done Done 2024-04-28
403 9 RP 250 945 Completed Done 0 0 250 0 Done Done 2024-04-28
404 9 SSW 197 496 Completed Done 0 0 197 0 Done Done 2024-04-25
405 9 STG 169 511 Completed Done 0 0 169 0 Done Done 2024-04-26