CLR (Computerization of Land Records) - Physical Progress

State/UT: RAJASTHAN
District: BIKANER
Tehsil Name: Khajuwala
S.No. Village Name Total No. of ROR Total No. of Land Owners/ Holders ROR Data Entry as of Previous settlement (100% checked and frozen) Availability of ROR Distribution/Printing Software ROR Linkage With Aadhaar No. of Land Owners/ Holders whose ROR is linked with Aadhaar Whether Mutation notice and Mutation Workflow are Computerized Issuance of Digitally Signed ROR Status Entry Date
Completed Ongoing Not Started
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
1 10 BD A 55 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
2 10 BD B 42 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
3 10 BD C 37 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
4 10 DWD 66 141 Completed Done 0 0 66 141 Done Not Done 2024-09-18
5 10 KHM 56 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
6 10 KJD 61 115 Completed Done 0 0 61 115 Done Not Done 2024-09-18
7 10 KLD 67 93 Completed Done 0 0 67 93 Not Done Not Done 2024-09-19
8 10 KLD A 63 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
9 10 KLD B 49 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
10 10 KYD A 42 112 Completed Done 0 0 42 112 Done Not Done 2024-09-09
11 10 KYD B 62 119 Completed Done 0 0 62 119 Done Not Done 2024-09-09
12 10 PRM 4 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
13 10 SSM 71 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
14 11 BD A 58 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
15 11 BD B 50 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
16 11 DWD 59 110 Completed Done 0 0 59 110 Not Done Not Done 2024-09-18
17 11 DWD A 29 36 Completed Done 0 0 29 36 Done Not Done 2024-09-18
18 11 KJD 39 57 Completed Done 0 0 39 57 Not Done Not Done 2024-09-18
19 11 KLD 61 105 Completed Done 0 0 61 105 Not Done Not Done 2024-09-19
20 11 KLD (Kundal Distributory) 50 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
21 11 KYD A 60 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
22 11 KYD B 63 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
23 11 PKD 11 9 Completed Done 0 0 11 9 Done Not Done 2024-09-18
24 11 SSM 77 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
25 12 BD 51 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
26 12 DWD 37 58 Completed Done 0 0 37 58 Not Done Not Done 2024-09-18
27 12 KHM 23 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
28 12 KHM B 90 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
29 12 KJD 28 54 Completed Done 0 0 28 54 Not Done Not Done 2024-09-18
30 12 KLD (Kharula Dist.) 36 58 Completed Done 0 0 36 58 Not Done Not Done 2024-09-19
31 12 KLD (Kundal Distributory) 59 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
32 12 Kyd 66 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
33 1-2 MDM 50 109 Completed Done 0 0 50 109 Done Not Done 2024-09-18
34 12 PB A 54 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
35 12 PB B 44 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
36 12 PB (OLD) 5 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
37 12 PKD 5 4 Completed Done 0 0 5 4 Done Not Done 2024-09-18
38 1-2 PRM 52 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
39 1-2 SLM (CAD) 74 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
40 1-2 SLM (OLD) 63 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
41 13 BD 61 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
42 13 DWD 54 87 Completed Done 0 0 54 87 Done Not Done 2024-09-18
43 13 KHM 80 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
44 13 KJD A 80 147 Completed Done 0 0 80 147 Done Not Done 2024-09-18
45 13 KJD B 46 92 Completed Done 0 0 46 92 Done Not Done 2024-09-18
46 13 KLD A 64 73 Completed Done 0 0 64 73 Not Done Not Done 2024-09-19
47 13 KLD A(Kundal Distributory) 49 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
48 13 KLD B (Kharula Dist.) 74 92 Completed Done 0 0 74 92 Not Done Not Done 2024-09-19
49 13 KLD B(Kundal Distributory) 70 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
50 13 KLD (OLD) 18 25 Completed Done 0 0 18 25 Not Done Not Done 2024-09-19
51 13 KYD A 56 189 Completed Done 0 0 56 189 Done Not Done 2024-09-09
52 13 KYD B 62 120 Completed Done 0 0 62 120 Done Not Done 2024-09-09
53 13 PB 77 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
54 13 PKD 2 2 Completed Done 0 0 2 2 Done Not Done 2024-09-18
55 14 BD A 41 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
56 14 BD B 62 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
57 14 BLD A 43 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
58 14 BLD B 59 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
59 14 DWD 28 58 Completed Done 0 0 28 58 Done Not Done 2024-09-18
60 14 KHM 54 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
61 14 KJD A 100 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
62 14 KJD B 29 104 Completed Done 0 0 29 104 Not Done Not Done 2024-09-11
63 14 KJD C 65 113 Completed Done 0 0 65 113 Not Done Not Done 2024-09-11
64 14 KLD A 60 90 Completed Done 0 0 60 90 Not Done Not Done 2024-09-19
65 14 KLD B 44 80 Completed Done 0 0 44 80 Not Done Not Done 2024-09-19
66 14 KYD 54 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
67 14 PB A 68 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
68 14 PB B 65 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
69 14 PKD 14 22 Completed Done 0 0 14 22 Done Not Done 2024-09-18
70 14 PKD A 38 85 Completed Done 0 0 38 85 Not Done Not Done 2024-09-18
71 15 BD A 47 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
72 15 BD B 55 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
73 15 BLD 50 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
74 15 DWD 34 74 Completed Done 0 0 34 74 Done Not Done 2024-09-18
75 15 KHM 54 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
76 15 KJD (CAD) 62 146 Completed Done 0 0 62 146 Not Done Not Done 2024-09-11
77 15 KJD (OLD) 10 17 Completed Done 0 0 10 17 Not Done Not Done 2024-09-11
78 15 KLD 71 108 Completed Done 0 0 71 108 Not Done Not Done 2024-09-19
79 15 KYD 54 93 Completed Done 0 0 54 93 Done Not Done 2024-09-09
80 15 PB 40 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
81 15 PKD 35 44 Completed Done 0 0 35 44 Done Not Done 2024-09-18
82 16BD 59 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
83 16 BLD A 31 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
84 16 BLD B 74 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
85 16 BLD (OLD) 77 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
86 16 DWD 64 109 Completed Done 0 0 64 109 Done Not Done 2024-09-18
87 16 KHM 100 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
88 16 KJD 100 238 Completed Done 0 0 100 238 Not Done Not Done 2024-09-11
89 16 KLD 34 71 Completed Done 0 0 34 71 Not Done Not Done 2024-09-19
90 16 KYD 78 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
91 16 PB 53 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
92 16 PKD 41 54 Completed Done 0 0 41 54 Done Not Done 2024-09-18
93 17 BD A 45 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
94 17 BD B 41 0 Completed Done 0 0 NR Not Done Not Done 2016-06-01
95 17 BLD A 48 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
96 17 BLD B 36 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
97 17 DWD A 73 64 Completed Done 0 0 73 64 Not Done Not Done 2024-09-19
98 17 DWD B 45 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
99 17 KHM A 56 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
100 17 KHM B 40 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
101 17 KJD A 68 181 Completed Done 0 0 68 181 Not Done Not Done 2024-09-11
102 17 KJD B 48 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
103 17 KLD 35 48 Completed Done 0 0 35 48 Not Done Not Done 2024-09-19
104 17 KYD A 78 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
105 17 KYD B 75 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
106 17 KYD C 39 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
107 17 PB A 33 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
108 17 PB (OLD) 21 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
109 17 PKD 28 70 Completed Done 0 0 28 70 Done Not Done 2024-09-18
110 17 PKD A 58 132 Completed Done 0 0 58 132 Done Not Done 2024-09-18
111 17 PKD B 43 93 Completed Done 0 0 43 93 Done Not Done 2024-09-18
112 18 BD A 58 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
113 18 BD B 53 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
114 18 BLD 144 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
115 18 BLD 2 79 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
116 18 DWD A 44 107 Completed Done 0 0 44 107 Not Done Not Done 2024-09-19
117 18 DWD B 37 93 Completed Done 0 0 37 93 Not Done Not Done 2024-09-19
118 18 DWD C 51 99 Completed Done 0 0 51 99 Not Done Not Done 2024-09-19
119 18 KHM 34 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
120 18 KHM A 34 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
121 18 KJD 72 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
122 18 KLD 101 172 Completed Done 0 0 101 172 Not Done Not Done 2024-09-19
123 18 KYD 45 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
124 18 PB 26 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
125 18 PKD 20 41 Completed Done 0 0 20 41 Done Not Done 2024-09-18
126 19BD 71 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
127 19 BLD 74 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
128 19 DWD 38 106 Completed Done 0 0 38 106 Not Done Not Done 2024-09-19
129 19 KHM A 44 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
130 19 KHM B 119 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
131 19 KJD A 55 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
132 19 KJD B 40 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
133 19 KLD (CAD) 54 75 Completed Done 0 0 54 75 Not Done Not Done 2024-09-19
134 19 KLD (OLD) 34 46 Completed Done 0 0 34 46 Not Done Not Done 2024-09-19
135 19 KYD A 37 74 Completed Done 0 0 37 74 Done Not Done 2024-09-09
136 19 KYD B 50 20 Completed Done 0 0 50 20 Done Not Done 2024-09-09
137 19 PB 70 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
138 19 PKD 34 55 Completed Done 0 0 34 55 Done Not Done 2024-09-18
139 19 PKD A 37 74 Completed Done 0 0 37 74 Done Not Done 2024-09-18
140 1 ALM 89 109 Completed Done 0 0 89 109 Done Not Done 2024-09-24
141 1 BGM 40 49 Completed Done 0 0 40 49 Done Not Done 2024-09-24
142 1 BM A 60 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
143 1 BM B 50 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
144 1 BRWM 96 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
145 1 BWM 36 47 Completed Done 0 0 36 47 Done Not Done 2024-09-09
146 1 BWSM 51 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
147 1 BWSM A 63 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
148 1 BYM 62 67 Completed Done 0 0 62 67 Done Not Done 2024-09-09
149 1 DWD 51 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
150 1 GWM 65 94 Completed Done 0 0 65 94 Done Not Done 2024-09-09
151 1 HWM 59 69 Completed Done 0 0 59 69 Done Not Done 2024-09-09
152 1 KJD A 45 62 Completed Done 0 0 45 62 Not Done Not Done 2024-09-19
153 1 KJD B 51 65 Completed Done 0 0 51 65 Not Done Not Done 2024-09-19
154 1 KLD 51 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
155 1 KWM A 38 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
156 1 KWM B 40 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
157 1 KYM A 46 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
158 1 KYM B 43 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
159 1 MGWM (CAD) 93 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
160 1 MGWM (OLD) 167 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
161 1 MTM 32 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
162 1 MTM (CAD) 36 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
163 1 MWM 66 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
164 1 NGM 54 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
165 1 PBM 67 82 Completed Done 0 0 67 82 Not Done Not Done 2024-09-24
166 1 PHM A 75 142 Completed Done 0 0 75 142 Done Not Done 2024-09-09
167 1PHM(B) 77 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
168 1 PKM 37 65 Completed Done 0 0 37 65 Done Not Done 2024-09-18
169 1 PWM A 88 93 Completed Done 0 0 88 93 Not Done Not Done 2024-09-19
170 1 PWM B 56 61 Completed Done 0 0 56 61 Not Done Not Done 2024-09-19
171 1 PWM (CAD) 1 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
172 1 SHWM 137 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
173 1 SSM 31 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
174 1 SSM 1 53 62 Completed Done 0 0 53 62 Not Done Not Done 2024-09-24
175 1 SSM 2 A 46 61 Completed Done 0 0 46 61 Not Done Not Done 2024-09-24
176 1 SSM 2 B 43 54 Completed Done 0 0 43 54 Not Done Not Done 2024-09-24
177 1 SWM A 45 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
178 1 SWM B 36 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
179 20 Bd 49 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
180 20 BLD 89 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
181 20 KHM A 134 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
182 20 KHM B 61 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
183 20 KJD 36 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
184 20 KLD A 54 98 Completed Done 0 0 54 98 Not Done Not Done 2024-09-19
185 20 KLD B 38 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
186 20 KYD A 42 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
187 20 KYD B 47 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
188 20 PKD 28 45 Completed Done 0 0 28 45 Done Not Done 2024-09-18
189 21 BD A 57 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
190 21 BD B 71 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
191 21 BLD A 177 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
192 21 BLD B 121 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
193 21 KHM 55 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
194 21 KJD 36 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
195 21 KLD 35 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
196 21 KYD A 52 91 Completed Done 0 0 52 91 Done Not Done 2024-09-09
197 21 KYD B 37 87 Completed Done 0 0 37 87 Done Not Done 2024-09-09
198 21 PKD 16 25 Completed Done 0 0 16 25 Done Not Done 2024-09-18
199 21 SMD 26 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
200 22 BD 69 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
201 22 BLD 74 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
202 22 KHM 1 54 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
203 22 KHM 2 132 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
204 22 KJD 67 84 Completed Done 0 0 67 84 Done Not Done 2024-09-09
205 22 KLD 55 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
206 22 Kyd 53 87 Completed Done 0 0 53 87 Done Not Done 2024-09-09
207 22 PKD A 17 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
208 23 BD A 46 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
209 23 BD B 43 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
210 23 BD C 48 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
211 23 BLD 74 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
212 23 KJD 56 76 Completed Done 0 0 56 76 Done Not Done 2024-09-09
213 23 KLD 57 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
214 23 KND A 65 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
215 23 KND B 50 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
216 23 KYD A 43 48 Completed Done 0 0 43 48 Not Done Not Done 2024-09-19
217 23 KYD B 50 65 Completed Done 0 0 50 65 Not Done Not Done 2024-09-19
218 23 PKD 21 44 Completed Done 0 0 21 44 Done Not Done 2024-09-18
219 24 BD A 72 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
220 24 BD B 58 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
221 24 BLD 93 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
222 24 KJD 101 114 Completed Done 0 0 101 114 Done Not Done 2024-09-09
223 24 KND 44 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
224 24 KYD A 48 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
225 24 KYD B 48 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
226 24 PKD 37 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
227 25 BD A 39 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
228 25 BD B 36 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
229 25 BLD A 149 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
230 25 BLD B 78 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
231 25 KND 87 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
232 25 KYD A 32 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
233 25 KYD B 54 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
234 26 BD A 48 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
235 26 BD B 36 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
236 26 BLD 66 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
237 26 KJD 72 85 Completed Done 0 0 72 85 Done Not Done 2024-09-09
238 26 KND A 30 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
239 26 KND B 46 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
240 26 KYD 62 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
241 27 -28 BLD 77 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
242 27 BD A 49 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
243 27 BD B 39 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
244 27 KND 64 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
245 27 KYD A 39 42 Completed Done 0 0 39 42 Not Done Not Done 2024-09-19
246 27 KYD B 46 58 Completed Done 0 0 46 58 Not Done Not Done 2024-09-19
247 28 BD A 57 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
248 28 BD B 53 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
249 28 BD C 24 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
250 28 Kjd 106 117 Completed Done 0 0 106 117 Not Done Not Done 2024-09-09
251 28 Kyd 63 78 Completed Done 0 0 63 78 Not Done Not Done 2024-09-19
252 29 BLD 33 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
253 29 KJD 109 140 Completed Done 0 0 109 140 Done Not Done 2024-09-09
254 29 KYD A 45 45 Completed Done 0 0 45 45 Not Done Not Done 2024-09-19
255 29 KYD B 57 63 Completed Done 0 0 57 63 Not Done Not Done 2024-09-19
256 29 KYD (CAD) 2 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
257 2 ALM 84 103 Completed Done 0 0 84 103 Done Not Done 2024-09-09
258 2AM 76 154 Completed Done 0 0 76 154 Done Not Done 2024-09-09
259 2 BGM 93 113 Completed Done 0 0 93 113 Done Not Done 2024-09-24
260 2 BRWM A 52 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
261 2 BRWM B 48 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
262 2 BRWM (CAD) 1 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
263 2 BWM 32 57 Completed Done 0 0 32 57 Done Not Done 2024-09-09
264 2 BYM A 60 71 Completed Done 0 0 60 71 Done Not Done 2024-09-09
265 2 BYM B 24 26 Completed Done 0 0 24 26 Done Not Done 2024-09-09
266 2 DWD 82 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
267 2 GWM 54 101 Completed Done 0 0 54 101 Done Done 2024-09-06
268 2 HWM 73 79 Completed Done 0 0 73 79 Done Not Done 2024-09-09
269 2 KJD A 46 111 Completed Done 0 0 46 111 Done Not Done 2024-09-09
270 2 KJD B 50 90 Completed Done 0 0 50 90 Done Not Done 2024-09-09
271 2KLD 54 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
272 2 KWM A 64 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
273 2 KWM B 38 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
274 2 KYD 63 159 Completed Done 0 0 63 159 Done Not Done 2024-09-09
275 2 KYM 71 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
276 2 MGWM 97 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
277 2 MTM 68 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
278 2 MWM 78 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
279 2 NGM 41 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
280 2 PBM A 43 48 Completed Done 0 0 43 48 Not Done Not Done 2024-09-24
281 2 PBM B 53 61 Completed Done 0 0 53 61 Not Done Not Done 2024-09-24
282 2 PHM A 32 71 Completed Done 0 0 32 71 Done Not Done 2024-09-09
283 2 PHM B 46 101 Completed Done 0 0 46 101 Done Not Done 2024-09-09
284 2 PKM 29 65 Completed Done 0 0 29 65 Done Not Done 2024-09-18
285 2 PWM 55 74 Completed Done 0 0 55 74 Not Done Not Done 2024-09-19
286 2 SHWM 71 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
287 2 SSM 47 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
288 2 SSM 1 55 74 Completed Done 0 0 55 74 Not Done Not Done 2024-09-24
289 30 BLD 83 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
290 30 KJD 50 67 Completed Done 0 0 50 67 Done Not Done 2024-09-09
291 30 KYD 71 82 Completed Done 0 0 71 82 Not Done Not Done 2024-09-24
292 31 KJD 42 49 Completed Done 0 0 42 49 Done Not Done 2024-09-09
293 31 Kyd 76 90 Completed Done 0 0 76 90 Not Done Not Done 2024-09-24
294 32 KJD 120 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
295 32 KYD A 52 68 Completed Done 0 0 52 68 Not Done Not Done 2024-09-24
296 32 KYD B 60 77 Completed Done 0 0 60 77 Not Done Not Done 2024-09-24
297 33 Kjd 41 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
298 33 KYD A 71 94 Completed Done 0 0 71 94 Not Done Not Done 2024-09-24
299 33 KYD B 48 66 Completed Done 0 0 48 66 Not Done Not Done 2024-09-24
300 34 KJD 48 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
301 34 Kyd 130 169 Completed Done 0 0 130 169 Not Done Not Done 2024-09-24
302 35 KJD A 49 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
303 35 KJD B 36 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
304 35 KYD 50 68 Completed Done 0 0 50 68 Done Not Done 2024-09-24
305 36 KJD 53 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
306 36 KYD 39 48 Completed Done 0 0 39 48 Not Done Not Done 2024-09-24
307 37 KJD 48 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
308 37 KYD 55 68 Completed Done 0 0 55 68 Not Done Not Done 2024-09-24
309 38 KJD 20 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
310 38 KYD 111 128 Completed Done 0 0 111 128 Not Done Not Done 2024-09-24
311 39 Kjd 64 117 Completed Done 0 0 64 117 Done Not Done 2024-09-18
312 39 KYD 65 76 Completed Done 0 0 65 76 Not Done Not Done 2024-09-24
313 3 BGM A 96 110 Completed Done 0 0 96 110 Done Not Done 2024-09-09
314 3 BGM B 55 57 Completed Done 0 0 55 57 Done Not Done 2024-09-09
315 3 BWM 56 73 Completed Done 0 0 56 73 Done Not Done 2024-09-09
316 3 BYM 92 118 Completed Done 0 0 92 118 Done Not Done 2024-09-09
317 3 DWD 50 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
318 3 KJD 97 182 Completed Done 0 0 97 182 Done Not Done 2024-09-09
319 3 KLD (Kharula Distributory) 50 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
320 3 KLD (Kundal Distributory) 56 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
321 3 KWM A 61 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
322 3 KWM B 70 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
323 3KYD(A) 63 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
324 3 KYD B 60 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
325 3 MGWM (CAD) 141 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
326 3 MGWM (OLD) 39 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
327 3 MTM 19 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
328 3 MWM 75 154 Completed Done 0 0 75 154 Done Not Done 2024-09-18
329 3 PHM A 69 150 Completed Done 0 0 69 150 Done Not Done 2024-09-09
330 3 PHM B 52 118 Completed Done 0 0 52 118 Done Not Done 2024-09-09
331 3 PKM 16 19 Completed Done 0 0 16 19 Done Not Done 2024-09-18
332 3 PRM 91 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
333 3 Pwm 85 105 Completed Done 0 0 85 105 Done Done 2024-09-19
334 3 SLM 58 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
335 3 SLM A 119 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
336 3 SSM 1 A 56 64 Completed Done 0 0 56 64 Not Done Not Done 2024-09-24
337 3 SSM 1 B 55 67 Completed Done 0 0 55 67 Not Done Not Done 2024-09-24
338 3 SSM A 77 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
339 3 SSM B 48 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
340 40 KJD 16 41 Completed Done 0 0 16 41 Done Not Done 2024-09-18
341 40 KJD A 23 23 Completed Done 0 0 23 23 Done Not Done 2024-09-18
342 40 Kyd 59 78 Completed Done 0 0 59 78 Not Done Not Done 2024-09-24
343 41 KJD 24 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
344 41 KYD A 55 60 Completed Done 0 0 55 60 Not Done Not Done 2024-09-24
345 41 KYD B 93 115 Completed Done 0 0 93 115 Not Done Not Done 2024-09-24
346 42 KJD 31 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
347 42 KYD 74 89 Completed Done 0 0 74 89 Not Done Not Done 2024-09-24
348 43 KJD 75 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
349 43 KYD A 39 43 Completed Done 0 0 39 43 Not Done Not Done 2024-09-24
350 43 KYD (B) 60 75 Completed Done 0 0 60 75 Not Done Not Done 2024-09-24
351 44 KYD 77 89 Completed Done 0 0 77 89 Not Done Not Done 2024-09-24
352 4 BGM A 91 106 Completed Done 0 0 91 106 Done Not Done 2024-09-09
353 4 BGM B 58 65 Completed Done 0 0 58 65 Done Not Done 2024-09-09
354 4 BWM 30 35 Completed Done 0 0 30 35 Done Not Done 2024-09-09
355 4 DWD 74 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
356 4 KHM 107 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
357 4 KJD 43 55 Completed Done 0 0 43 55 Not Done Not Done 2024-09-19
358 4 KLD 56 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
359 4 KWM 72 0 Completed Done 0 0 NR Not Done Not Done 2016-06-13
360 4KYD 67 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
361 4 KYD 79 134 Not Started 0 0 0 NR Not Done Not Done 2024-09-09
362 4 MWM 53 93 Completed Done 0 0 53 93 Done Not Done 2024-09-18
363 4 PHM 47 123 Completed Done 0 0 47 123 Done Not Done 2024-09-09
364 4 PKM 33 71 Completed Done 0 0 33 71 Done Not Done 2024-09-18
365 4 PRM 78 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
366 4 PWM A 62 67 Completed Done 0 0 62 67 Not Done Not Done 2024-09-19
367 4 PWM B 77 82 Completed Done 0 0 77 82 Not Done Not Done 2024-09-19
368 4 SSM 35 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
369 5 BGM 79 94 Completed Done 0 0 79 94 Done Not Done 2024-09-09
370 5 DWD 42 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
371 5 KHM 64 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
372 5 Kjd 99 183 Completed Done 0 0 99 183 Done Done 2024-09-09
373 5 KLD 67 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
374 5 KLD (CAD) 55 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
375 5 KYD A 52 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
376 5 KYDB 41 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
377 5 MTM (CAD) 47 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
378 5 MTM (OLD) 10 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
379 5 MWM 53 144 Completed Done 0 0 53 144 Done Not Done 2024-09-18
380 5 PHM A 47 124 Completed Done 0 0 47 124 Done Not Done 2024-09-09
381 5 PHM B 56 122 Completed Done 0 0 56 122 Not Done Not Done 2024-09-09
382 5 PRM 67 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
383 5 SJM 57 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
384 5 SSM 68 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
385 6BD(A) 38 122 Completed Done 0 0 38 122 Done Not Done 2024-09-09
386 6 Bd (B) 34 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
387 6 BGM 100 137 Completed Done 0 0 100 137 Done Not Done 2024-09-09
388 6 DWD 71 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
389 6 KHM 88 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
390 6 KJD A 41 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
391 6 KJD B 98 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
392 6 KLD 41 114 Completed Done 0 0 41 114 Not Done Not Done 2024-09-19
393 6 KLD A 45 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
394 6 KLD B 43 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
395 6 KYD A 36 91 Completed Done 0 0 36 91 Done Not Done 2024-09-09
396 6KYD B 51 120 Completed Done 0 0 51 120 Done Not Done 2024-09-09
397 6 MWM 55 107 Completed Done 0 0 55 107 Done Not Done 2024-09-18
398 6 PHM A 51 82 Completed Done 0 0 51 82 Done Not Done 2024-09-09
399 6 PHM B 40 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
400 6 PRM 136 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
401 6 SJM A 62 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
402 6 SJM B 95 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
403 6 SSM 48 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
404 7 BD 53 139 Completed Done 0 0 53 139 Done Not Done 2024-09-09
405 7 DWD 48 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
406 7 KHM 38 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
407 7 KHM A 59 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
408 7 KLD (Kharula Distributory) 56 104 Completed Done 0 0 56 104 Not Done Not Done 2024-09-19
409 7 KLD (Kundal Distributory) 106 0 Completed Done 0 0 NR Not Done Not Done 2016-06-20
410 7 KYD A 44 103 Completed Done 0 0 44 103 Done Not Done 2024-09-09
411 7 KYD B 49 109 Completed Done 0 0 49 109 Done Not Done 2024-09-09
412 7 PHM A 65 126 Completed Done 0 0 65 126 Done Not Done 2024-09-09
413 7 PHM B 38 68 Completed Done 0 0 38 68 Done Not Done 2024-09-09
414 7 PRM 99 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
415 7SSM 105 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
416 7 SSM A 55 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
417 8 BD A 52 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
418 8 BD B 53 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
419 8 DWD 45 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
420 8 KHM 42 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
421 8 KJD A 203 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
422 8 KJD B 175 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
423 8 KLD 106 103 Completed Done 0 0 106 103 Not Done Not Done 2024-09-19
424 8 KLD (Kharula Distributory) 51 0 Completed Done 0 0 NR Not Done Not Done 2016-06-20
425 8 KYD A 56 123 Completed Done 0 0 56 123 Done Not Done 2024-09-09
426 8 KYD B 51 94 Completed Done 0 0 51 94 Done Not Done 2024-09-09
427 8 PRM 50 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
428 8 SSM 74 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
429 9 BD 50 152 Completed Done 0 0 50 152 Done Not Done 2024-09-09
430 9 DWD 68 105 Completed Done 0 0 68 105 Done Not Done 2024-09-18
431 9 KJD 68 126 Completed Done 0 0 68 126 Done Not Done 2024-09-18
432 9 KLD 53 76 Completed Done 0 0 53 76 Not Done Not Done 2024-09-19
433 9 KLD A 63 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
434 9 KLD B 84 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
435 9 KYD A 48 119 Completed Done 0 0 48 119 Done Not Done 2024-09-09
436 9 KYD B 50 138 Completed Done 0 0 50 138 Done Not Done 2024-09-09
437 9 PRM 70 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
438 9 SSM 77 0 Completed Done 0 0 NR Not Done Not Done 2016-05-22
439 Akasar 2 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
440 Ballar 1 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
441 Dantaur 9 0 Completed Done 0 0 NR Not Done Not Done 2016-05-23
442 Karamwala 5 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
443 Ramjanwala 1 0 Completed Done 0 0 NR Not Done Not Done 2016-04-12
444 SIYASAR BARANI 1 0 Completed Done 0 0 NR Not Done Not Done 2016-06-01