Map Digitization Status - Physical Progress

State/UT: RAJASTHAN ,
District Name: Anoopgarh
Tehsil Name: Vijainagar
S.No. Village Name Total No. of Mapsheets/ FMBs/ Tippans Total No. of Mapsheets/ FMBs/ Tippans in good condition No. Of Mapsheets/ FMBs/ Tippans Digitized Spatial Data verified Are Cadastral Maps Geo-Referenced Are Cadastral Maps linked With ROR Are Cadastral Maps simultaneously updated with Bhu-Naksha used for Cadastral Maps Other software used for Cadastral Maps Status Entry Date Remark
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
1 10 Apd-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
2 10 Apd-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
3 10 As 3 3 3 Done Not Done Done Done Done No 2024-05-27
4 10 Bld 2 2 2 Done Not Done Done Done Done No 2024-05-27
5 10 Blm-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
6 10 Blm-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
7 10 Gb 3 3 3 Done Not Done Done Done Done No 2024-05-27
8 10 Gm 2 2 2 Done Not Done Done Done Done No 2024-05-27
9 10 Sarkari 2 2 2 Done Not Done Done Done Done No 2024-05-27
10 11 Apd 1 1 1 Done Not Done Done Done Done No 2024-05-27
11 11 As 4 4 4 Done Not Done Done Done Done No 2024-05-27
12 11 Bld 1 1 1 Done Not Done Done Done Done No 2024-05-27
13 11 Blm 1 1 1 Done Not Done Done Done Done No 2024-05-27
14 11 Gb-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
15 11 Gb-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
16 11 Joiyanwali 1 1 1 Done Not Done Done Done Done No 2024-05-27
17 12 As 2 2 2 Done Not Done Done Done Done No 2024-05-27
18 12 Bld 1 1 1 Done Not Done Done Done Done No 2024-05-27
19 12 Blm-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
20 12 Blm-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
21 12 Gb-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
22 12 Gb-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
23 12 Gm 3 3 3 Done Not Done Done Done Done No 2024-05-27
24 12 Kishnawali 1 1 1 Done Not Done Done Done Done No 2024-05-27
25 13 Apd-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
26 13 Apd-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
27 13 As 4 4 4 Done Not Done Done Done Done No 2024-05-27
28 13 Bld 4 4 4 Done Not Done Done Done Done No 2024-05-27
29 13 Bld-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
30 13 Bld-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
31 13 Bld-C 1 1 1 Done Not Done Done Done Done No 2024-05-27
32 13 Blm-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
33 13 Blm-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
34 13 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
35 13 Gm 2 2 2 Done Not Done Done Done Done No 2024-05-27
36 14 As-A 4 4 4 Done Not Done Done Done Done No 2024-05-27
37 14 As-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
38 14 Bgd 2 2 2 Done Not Done Done Done Done No 2024-05-27
39 14 Bld-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
40 14 Bld-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
41 14 Bld-C 2 2 2 Done Not Done Done Done Done No 2024-05-27
42 14 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
43 14 Gm 2 2 2 Done Not Done Done Done Done No 2024-05-27
44 14 Sd 1 1 1 Done Not Done Done Done Done No 2024-05-27
45 15 As-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
46 15 As-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
47 15 Bgd 2 2 2 Done Not Done Done Done Done No 2024-05-27
48 15 Bld-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
49 15 Bld-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
50 15 Gb 1 1 1 Done Not Done Done Done Done No 2024-05-27
51 15 Gm 1 1 1 Done Not Done Done Done Done No 2024-05-27
52 15 Sd 2 2 2 Done Not Done Done Done Done No 2024-05-27
53 16 As 2 2 2 Done Not Done Done Done Done No 2024-05-27
54 16 Bld-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
55 16 Bld-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
56 16 Bld-C 3 3 3 Done Not Done Done Done Done No 2024-05-27
57 16 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
58 16 Gm 3 3 3 Done Not Done Done Done Done No 2024-05-27
59 16 Sd 1 1 1 Done Not Done Done Done Done No 2024-05-27
60 17 As 1 1 1 Done Not Done Done Done Done No 2024-05-27
61 17 Bld 2 2 2 Done Not Done Done Done Done No 2024-05-27
62 17 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
63 17 Gm 4 4 4 Done Not Done Done Done Done No 2024-05-27
64 17 Sd 1 1 1 Done Not Done Done Done Done No 2024-05-27
65 17 Sd-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
66 18 As 3 3 3 Done Not Done Done Done Done No 2024-05-27
67 18 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
68 18 Sd 2 2 2 Done Not Done Done Done Done No 2024-05-27
69 19 As 1 1 1 Done Not Done Done Done Done No 2024-05-27
70 19 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
71 19 Sd 2 2 2 Done Not Done Done Done Done No 2024-05-27
72 19 sd cad rahit 1 1 1 Done Not Done Done Done Done No 2024-05-27
73 1 Apd 2 2 2 Done Not Done Done Done Done No 2024-11-07
74 1 Bgd 2 2 2 Done Not Done Done Done Done No 2024-05-27
75 1 BGM 1 1 1 Done Not Done Done Done Done No 2024-05-27
76 1 Bld 1 1 1 Done Not Done Done Done Done No 2024-05-27
77 1 Blm 2 2 2 Done Not Done Done Done Done No 2024-05-27
78 1 Cdm-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
79 1 Cdm-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
80 1 Dam 2 2 2 Done Not Done Done Done Done No 2024-05-27
81 1 Djm 2 2 2 Done Not Done Done Done Done No 2024-05-27
82 1 Dm 2 2 2 Done Not Done Done Done Done No 2024-05-27
83 1 GBA 2 2 2 Done Not Done Done Done Done No 2024-05-27
84 1 Gb-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
85 1 Gm 2 2 2 Done Not Done Done Done Done No 2024-05-27
86 1 Jkm 1 1 1 Done Not Done Done Done Done No 2024-05-27
87 1 Jsd 1 1 1 Done Not Done Done Done Done No 2024-05-27
88 1 Ksd-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
89 1 Ksd-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
90 1 Lgm 1 1 1 Done Not Done Done Done Done No 2024-05-27
91 1 Msd 6 6 6 Done Not Done Done Done Done No 2024-05-27
92 1 Msd-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
93 1 Nzm-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
94 1 Nzm-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
95 1 Ptd-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
96 1 Ptd-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
97 1 Rbm 1 1 1 Done Not Done Done Done Done No 2024-05-27
98 1 Sad 1 1 1 Done Not Done Done Done Done No 2024-05-27
99 1 Svsm-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
100 1 Svsm-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
101 1 Tsm 4 4 4 Done Not Done Done Done Done No 2024-05-27
102 20 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
103 20 Sd-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
104 20 Sd-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
105 21 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
106 21 Sd-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
107 21 Sd-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
108 22 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
109 23 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
110 23 Sd 1 1 1 Done Not Done Done Done Done No 2024-05-27
111 24 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
112 25 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
113 26 Gb 3 3 3 Done Not Done Done Done Done No 2024-05-27
114 27 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
115 28 Gb-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
116 28 Gb-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
117 29 Gb-A (Rural) 3 3 3 Done Not Done Done Done Done No 2024-05-27
118 29 Gb-B (Rural) 2 2 2 Done Not Done Done Done Done No 2024-05-27
119 2 Apd-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
120 2 Apd-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
121 2 Bgd 2 2 2 Done Not Done Done Done Done No 2024-05-27
122 2 Bgm 2 2 2 Done Not Done Done Done Done No 2024-05-27
123 2 Bld 1 1 1 Done Not Done Done Done Done No 2024-05-27
124 2 Bld-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
125 2 Bld-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
126 2 Blm 1 1 1 Done Not Done Done Done Done No 2024-05-27
127 2 Dam 1 1 1 Done Not Done Done Done Done No 2024-05-27
128 2 Djm-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
129 2 Djm-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
130 2 Dm 2 2 2 Done Not Done Done Done Done No 2024-05-27
131 2 Gb-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
132 2 Gb-B 1 1 1 Done Not Done Done Done Done No 2024-05-28
133 2 Gb Hindu 2 2 2 Done Not Done Done Done Done No 2024-05-27
134 2 Gm 2 2 2 Done Not Done Done Done Done No 2024-05-27
135 2 Jkm 2 2 2 Done Not Done Done Done Done No 2024-05-27
136 2 Jsd 2 2 2 Done Not Done Done Done Done No 2024-05-27
137 2 Ksd 1 1 1 Done Not Done Done Done Done No 2024-05-27
138 2 Kwm 2 2 2 Done Not Done Done Done Done No 2024-05-27
139 2 Lgm 2 2 2 Done Not Done Done Done Done No 2024-05-27
140 2 Msd 2 2 2 Done Not Done Done Done Done No 2024-05-27
141 2 Nzp 2 2 2 Done Not Done Done Done Done No 2024-05-27
142 2 Ptd 2 2 2 Done Not Done Done Done Done No 2024-05-27
143 2 Rbm 1 1 1 Done Not Done Done Done Done No 2024-05-27
144 2 Rtm 1 1 1 Done Not Done Done Done Done No 2024-05-27
145 2 Sad 2 2 2 Done Not Done Done Done Done No 2024-05-27
146 2 Sjm 1 1 1 Done Not Done Done Done Done No 2024-05-27
147 2 Stb 1 1 1 Done Not Done Done Done Done No 2024-05-27
148 30 GB 1 1 1 Done Not Done Done Done Done No 2024-05-28
149 31 Gb (Rural) 2 2 2 Done Not Done Done Done Done No 2024-05-27
150 32 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
151 33 Gb (Rural) 2 2 2 Done Not Done Done Done Done No 2024-05-27
152 34 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
153 35 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
154 36 Gb 3 3 3 Done Not Done Done Done Done No 2024-05-27
155 37 Gb-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
156 37 Gb-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
157 38 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
158 39 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
159 3 Apd-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
160 3 Apd-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
161 3 Bgd 3 3 3 Done Not Done Done Done Done No 2024-05-27
162 3 Bgm 2 2 2 Done Not Done Done Done Done No 2024-05-27
163 3 Bld 1 1 1 Done Not Done Done Done Done No 2024-05-27
164 3 Blm 1 1 1 Done Not Done Done Done Done No 2024-05-27
165 3 Blm-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
166 3 Dam 2 2 2 Done Not Done Done Done Done No 2024-05-27
167 3 Djm 1 1 1 Done Not Done Done Done Done No 2024-05-27
168 3 Gb-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
169 3 Gb-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
170 3 Gm 2 2 2 Done Not Done Done Done Done No 2024-05-27
171 3 Jsd 6 6 6 Done Not Done Done Done Done No 2024-05-27
172 3 Ksd 2 2 2 Done Not Done Done Done Done No 2024-05-27
173 3 Lc-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
174 3 Lc-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
175 3 Lgm 2 2 2 Done Not Done Done Done Done No 2024-05-27
176 3 Ptd 2 2 2 Done Not Done Done Done Done No 2024-05-27
177 3 Rbm 1 1 1 Done Not Done Done Done Done No 2024-05-27
178 3 Sad 2 2 2 Done Not Done Done Done Done No 2024-05-27
179 3 Stb 1 1 1 Done Not Done Done Done Done No 2024-05-27
180 40 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
181 41 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
182 42 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
183 43 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
184 44 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
185 45 Gb-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
186 45 Gb-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
187 46 Gb-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
188 46 Gb-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
189 47 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
190 48 Gb-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
191 48 Gb-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
192 49 Gb-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
193 49 Gb-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
194 4 Apd 1 1 1 Done Not Done Done Done Done No 2024-05-27
195 4 As 3 3 3 Done Not Done Done Done Done No 2024-05-27
196 4 Bgd 2 2 2 Done Not Done Done Done Done No 2024-05-27
197 4 Bgm 4 4 4 Done Not Done Done Done Done No 2024-05-27
198 4 Bld 1 1 1 Done Not Done Done Done Done No 2024-05-27
199 4 Blm 1 1 1 Done Not Done Done Done Done No 2024-05-27
200 4 Bpm 3 3 3 Done Not Done Done Done Done No 2024-05-27
201 4 Djm 2 2 2 Done Not Done Done Done Done No 2024-05-27
202 4 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
203 4 Jsd 6 6 6 Done Not Done Done Done Done No 2024-05-27
204 4 Lc-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
205 4 Lc-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
206 4 Lgm 1 1 1 Done Not Done Done Done Done No 2024-05-27
207 4 Ptd-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
208 4 Ptd-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
209 4 Stb 1 1 1 Done Not Done Done Done Done No 2024-05-27
210 50 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
211 51 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
212 51 Pbn 2 2 2 Done Not Done Done Done Done No 2024-05-27
213 52 Gb 1 1 1 Done Not Done Done Done Done No 2024-05-27
214 52 Pbn 3 3 3 Done Not Done Done Done Done No 2024-05-27
215 5 Apd-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
216 5 Apd-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
217 5 As-A 3 3 3 Done Not Done Done Done Done No 2024-05-27
218 5 As-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
219 5 Bgd 2 2 2 Done Not Done Done Done Done No 2024-05-27
220 5 Bld-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
221 5 Bld-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
222 5 Blm 1 1 1 Done Not Done Done Done Done No 2024-05-27
223 5 Gb-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
224 5 Gb-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
225 5 Gm 2 2 2 Done Not Done Done Done Done No 2024-05-27
226 5 Ptd 2 2 2 Done Not Done Done Done Done No 2024-05-27
227 5 Stb-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
228 5 Stb-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
229 6 Apd 1 1 1 Done Not Done Done Done Done No 2024-05-27
230 6 As 5 5 5 Done Not Done Done Done Done No 2024-05-27
231 6 Bgd 2 2 2 Done Not Done Done Done Done No 2024-05-27
232 6 Bld 1 1 1 Done Not Done Done Done Done No 2024-05-27
233 6 Blm-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
234 6 Blm-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
235 6 Gb-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
236 6 Gb-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
237 6 Gm 2 2 2 Done Not Done Done Done Done No 2024-05-27
238 6 Stb-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
239 6 Stb-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
240 6 Stb-C 1 1 1 Done Not Done Done Done Done No 2024-05-27
241 7 Apd 1 1 1 Done Not Done Done Done Done No 2024-05-27
242 7 Apd-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
243 7 As 3 3 3 Done Not Done Done Done Done No 2024-05-27
244 7 Bgd 1 1 1 Done Not Done Done Done Done No 2024-05-27
245 7 Bld 1 1 1 Done Not Done Done Done Done No 2024-05-27
246 7 Blm-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
247 7 Blm-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
248 7 Gb-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
249 7 Gb-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
250 7 Gm 2 2 2 Done Not Done Done Done Done No 2024-05-27
251 7 Lc 2 2 2 Done Not Done Done Done Done No 2024-05-27
252 7 Stb 2 2 2 Done Not Done Done Done Done No 2024-05-27
253 8 Apd-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
254 8 Apd-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
255 8 As 6 6 6 Done Not Done Done Done Done No 2024-05-27
256 8 Bgd-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
257 8 Bgd-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
258 8 Bgd-C 2 2 2 Done Not Done Done Done Done No 2024-05-27
259 8 Bld-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
260 8 Bld-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
261 8 Blm-A 1 1 1 Done Not Done Done Done Done No 2024-05-27
262 8 Blm-B 1 1 1 Done Not Done Done Done Done No 2024-05-27
263 8 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
264 8 Gm 2 2 2 Done Not Done Done Done Done No 2024-05-27
265 8 Stb 1 1 1 Done Not Done Done Done Done No 2024-05-27
266 9 Apd 2 2 2 Done Not Done Done Done Done No 2024-05-27
267 9 As-A 2 2 2 Done Not Done Done Done Done No 2024-05-27
268 9 As-B 2 2 2 Done Not Done Done Done Done No 2024-05-27
269 9 Bld 1 1 1 Done Not Done Done Done Done No 2024-05-27
270 9 Blm 1 1 1 Done Not Done Done Done Done No 2024-05-27
271 9 Gb 2 2 2 Done Not Done Done Done Done No 2024-05-27
272 9 Gm 3 3 3 Done Not Done Done Done Done No 2024-05-27
273 Bhagsar BARANI 1 1 1 Done Not Done Done Done Done No 2024-05-27
274 Chainpura Barani 1 1 1 Done Not Done Done Done Done No 2024-05-27
275 Dhandhra Barani 2 2 2 Done Not Done Done Done Done No 2024-05-27
276 Gomawali Barani 3 3 3 Done Not Done Done Done Done No 2024-05-27
277 Kunplee Barani 1 1 1 Done Not Done Done Done Done No 2024-05-27
278 Motasar BARANI 2 2 2 Done Not Done Done Done Done No 2024-05-27