Map Digitization Status - Physical Progress

State/UT: RAJASTHAN ,
District Name: HANUMANGARH
Tehsil Name: Tibi
S.No. Village Name Total No. of Mapsheets/ FMBs/ Tippans Total No. of Mapsheets/ FMBs/ Tippans in good condition No. Of Mapsheets/ FMBs/ Tippans Digitized Spatial Data verified Are Cadastral Maps Geo-Referenced Are Cadastral Maps linked With ROR Are Cadastral Maps simultaneously updated with Bhu-Naksha used for Cadastral Maps Other software used for Cadastral Maps Status Entry Date Remark
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
1 10 AG 1 1 1 Done Not Done Done Done Done No 2024-07-25
2 10 AG-A 1 1 1 Done Done Done Done Done No 2020-04-28
3 10 CDR-A 1 1 1 Done Not Done Done Done Done No 2024-07-25
4 10 CDR-B 1 1 1 Done Not Done Done Done Done No 2024-07-25
5 10 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
6 10 FTP 1 1 1 Done Not Done Done Done Done No 2024-07-25
7 10 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
8 10 MKS-A 1 1 1 Done Not Done Done Done Done No 2024-07-25
9 10 MKS-B 1 1 1 Done Not Done Done Done Done No 2024-07-25
10 10 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
11 10 RWD 1 1 0 Done Not Done Done Done Done No 2024-07-25
12 10 SBN 1 1 1 Done Not Done Done Done Done No 2024-07-25
13 10 SLW 1 1 0 Done Not Done Done Done Done No 2024-07-25
14 11 AG 1 1 1 Done Not Done Done Done Done No 2024-07-25
15 11 CDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
16 11 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
17 11 FTP 1 1 1 Done Not Done Done Done Done No 2024-07-25
18 11 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
19 11 MKS 1 1 1 Done Not Done Done Done Done No 2024-07-25
20 11 RWD 1 1 1 Done Not Done Done Done Done No 2024-07-25
21 11 SLW 1 1 1 Done Not Done Done Done Done No 2024-07-25
22 12 AG 1 1 1 Done Not Done Done Done Done No 2024-07-25
23 12 CDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
24 12 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
25 12 FTP-A 1 1 1 Done Not Done Done Done Done No 2024-07-25
26 12 FTP-B 1 1 1 Done Not Done Done Done Done No 2024-07-25
27 12 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
28 12 RWD 1 1 1 Done Not Done Done Done Done No 2024-07-25
29 12 SLW 1 1 1 Done Not Done Done Done Done No 2024-07-25
30 13 AG 1 1 1 Done Not Done Done Done Done No 2024-07-25
31 13 AG-A 1 1 1 Done Not Done Done Done Done No 2024-07-25
32 13 CDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
33 13 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
34 13 FTP 1 1 1 Done Not Done Done Done Done No 2024-07-25
35 13 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
36 13 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-29
37 13 RWD 1 1 1 Done Not Done Done Done Done No 2024-07-25
38 13 SLW 1 1 1 Done Not Done Done Done Done No 2024-07-25
39 14 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
40 14 FTP 1 1 1 Done Not Done Done Done Done No 2024-07-25
41 14 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
42 14 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
43 14 SLW 1 1 1 Done Not Done Done Done Done No 2024-07-25
44 15 CDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
45 15 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
46 15 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
47 15 SLW 1 1 1 Done Not Done Done Done Done No 2024-07-25
48 16 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
49 16 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
50 16 SLW 1 1 1 Done Not Done Done Done Done No 2024-07-25
51 17 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
52 17 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
53 18 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
54 18 KNN 2 2 2 Done Not Done Done Done Done No 2024-07-25
55 18 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-29
56 19 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
57 19 KNN 1 1 1 Done Not Done Done Done Done No 2024-07-25
58 19 NGC-A 1 1 1 Done Not Done Done Done Done No 2024-07-25
59 19 NGC-B 1 1 1 Done Not Done Done Done Done No 2024-07-25
60 1 A-BARANI 2 2 2 Done Not Done Done Done Done No 2024-07-25
61 1 AG 1 1 1 Done Not Done Done Done Done No 2024-07-25
62 1 BRN 1 1 1 Done Not Done Done Done Done No 2024-07-25
63 1 BRW 1 1 1 Done Not Done Done Done Done No 2024-07-25
64 1 CDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
65 1 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
66 1 DPM 1 1 1 Done Not Done Done Done Done No 2024-07-25
67 1 FTP-A 1 1 1 Done Not Done Done Done Done No 2024-07-25
68 1 FTP-B 1 1 1 Done Not Done Done Done Done No 2024-07-25
69 1 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
70 1 HMH 1 1 1 Done Not Done Done Done Done No 2024-07-25
71 1 KHR 1 1 1 Done Not Done Done Done Done No 2024-07-25
72 1 KSP-A 1 1 1 Done Not Done Done Done Done No 2024-07-25
73 1 KSP-B 1 1 1 Done Not Done Done Done Done No 2024-07-25
74 1 KSP-C 1 1 1 Done Not Done Done Done Done No 2024-07-25
75 1 MD 1 1 1 Done Not Done Done Done Done No 2024-07-25
76 1 MKS-A 1 1 1 Done Not Done Done Done Done No 2024-07-25
77 1 MKS-B 1 1 1 Done Not Done Done Done Done No 2024-07-25
78 1 MST 1 1 1 Done Not Done Done Done Done No 2024-07-25
79 1 MST-SM 1 1 1 Done Not Done Done Done Done No 2024-07-25
80 1 MZW 1 1 1 Done Not Done Done Done Done No 2024-07-25
81 1 MZW SM 1 1 1 Done Not Done Done Done Done No 2024-07-25
82 1 NDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
83 1 NGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
84 1 RK 1 1 1 Done Not Done Done Done Done No 2024-07-25
85 1 RWD 1 1 1 Done Not Done Done Done Done No 2024-07-29
86 1 SBN 1 1 1 Done Not Done Done Done Done No 2024-07-25
87 1 SRW 1 1 1 Done Not Done Done Done Done No 2024-07-25
88 1 TLW-A 1 1 1 Done Not Done Done Done Done No 2024-07-25
89 1 TLW-B 1 1 1 Done Not Done Done Done Done No 2024-07-25
90 20 KNN 2 2 2 Done Not Done Done Done Done No 2024-07-25
91 20 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
92 21 KNN 1 1 1 Done Not Done Done Done Done No 2024-07-25
93 21 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
94 22 KNN 1 1 1 Done Not Done Done Done Done No 2024-07-25
95 22 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
96 23 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
97 24 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
98 25 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
99 26 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
100 27 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
101 28 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
102 29 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
103 2 A-BARANI 2 2 2 Done Not Done Done Done Done No 2024-07-25
104 2 AG 1 1 1 Done Not Done Done Done Done No 2024-07-25
105 2 BRN 1 1 1 Done Not Done Done Done Done No 2024-07-25
106 2 CDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
107 2 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
108 2 DPM 1 1 1 Done Not Done Done Done Done No 2024-07-25
109 2 FTP 1 1 1 Done Not Done Done Done Done No 2024-07-25
110 2 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
111 2 KHR 1 1 1 Done Not Done Done Done Done No 2024-07-25
112 2 KSP 1 1 1 Done Not Done Done Done Done No 2024-07-25
113 2 MD 1 1 1 Done Not Done Done Done Done No 2024-07-25
114 2 MKS-A 1 1 1 Done Not Done Done Done Done No 2024-07-25
115 2 MKS-B 1 1 1 Done Not Done Done Done Done No 2024-07-25
116 2 MST 1 1 1 Done Not Done Done Done Done No 2024-07-25
117 2 MST-SM 1 1 1 Done Not Done Done Done Done No 2024-07-25
118 2 MZW 1 1 1 Done Not Done Done Done Done No 2024-07-25
119 2 MZW SM 1 1 1 Done Not Done Done Done Done No 2024-07-25
120 2 NDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
121 2 NGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
122 2 RK 1 1 1 Done Not Done Done Done Done No 2024-07-25
123 2 RP-CAD (RAHIT) 1 1 1 Done Not Done Done Done Done No 2024-07-25
124 2 RP-CAD (SAHIT) 1 1 1 Done Not Done Done Done Done No 2024-07-25
125 2 RWB 1 1 1 Done Not Done Done Done Done No 2024-07-25
126 2 RWD 1 1 1 Done Not Done Done Done Done No 2024-07-25
127 2 SBN 1 1 1 Done Not Done Done Done Done No 2024-07-25
128 2 SRW 1 1 1 Done Not Done Done Done Done No 2024-07-25
129 2 TLW 1 1 1 Done Not Done Done Done Done No 2024-07-25
130 30 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
131 32 NGC 1 1 1 Done Not Done Done Done Done No 2024-07-25
132 3 AG 1 1 1 Done Not Done Done Done Done No 2024-07-25
133 3 BRN 1 1 1 Done Not Done Done Done Done No 2024-07-25
134 3 BRW 1 1 1 Done Not Done Done Done Done No 2024-07-25
135 3 CDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
136 3 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
137 3 DPM 1 1 1 Done Not Done Done Done Done No 2024-07-25
138 3 FTP 1 1 1 Done Not Done Done Done Done No 2024-07-25
139 3 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
140 3 HMH 1 1 1 Done Not Done Done Done Done No 2024-07-25
141 3 KHR 1 1 1 Done Not Done Done Done Done No 2024-07-25
142 3 KSP 1 1 1 Done Not Done Done Done Done No 2024-07-25
143 3 MD 1 1 1 Done Not Done Done Done Done No 2024-07-25
144 3 MKS 1 1 1 Done Not Done Done Done Done No 2024-07-25
145 3 MST 1 1 1 Done Not Done Done Done Done No 2024-07-25
146 3 MST-SM 1 1 1 Done Not Done Done Done Done No 2024-07-25
147 3 MZW 1 1 1 Done Not Done Done Done Done No 2024-07-25
148 3 MZW SM 1 1 1 Done Not Done Done Done Done No 2024-07-25
149 3 NDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
150 3 RK 1 1 1 Done Not Done Done Done Done No 2024-07-29
151 3 RWB 1 1 1 Done Not Done Done Done Done No 2024-07-25
152 3 RWD 1 1 1 Done Not Done Done Done Done No 2024-07-25
153 3 SBN 1 1 1 Done Not Done Done Done Done No 2024-07-25
154 3 SRW 1 1 1 Done Not Done Done Done Done No 2024-07-25
155 3 SSW 1 1 1 Done Not Done Done Done Done No 2024-07-25
156 3 TLW 1 1 1 Done Not Done Done Done Done No 2024-07-25
157 4 AG 1 1 1 Done Not Done Done Done Done No 2024-07-25
158 4 BRN 1 1 1 Done Not Done Done Done Done No 2024-07-25
159 4 CDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
160 4 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
161 4 FTP 1 1 1 Done Not Done Done Done Done No 2024-07-25
162 4 HMH 1 1 1 Done Not Done Done Done Done No 2024-07-25
163 4 KHR 1 1 1 Done Not Done Done Done Done No 2024-07-25
164 4 KSP 1 1 1 Done Not Done Done Done Done No 2024-07-25
165 4 MD 1 1 1 Done Not Done Done Done Done No 2024-07-25
166 4 MKS 1 1 1 Done Not Done Done Done Done No 2024-07-25
167 4 MST 1 1 1 Done Not Done Done Done Done No 2024-07-25
168 4 MST SM (RAHIT) 1 1 1 Done Not Done Done Done Done No 2024-07-25
169 4 MST SM (SAHIT) 1 1 1 Done Not Done Done Done Done No 2024-07-25
170 4 MZW 1 1 1 Done Not Done Done Done Done No 2024-07-25
171 4 NDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
172 4 NGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
173 4 RK 1 1 1 Done Not Done Done Done Done No 2024-07-25
174 4 RP 1 1 1 Done Not Done Done Done Done No 2024-07-25
175 4 RWB 1 1 1 Done Not Done Done Done Done No 2024-07-25
176 4 RWD 1 1 1 Done Not Done Done Done Done No 2024-07-25
177 4 SBN 1 1 1 Done Not Done Done Done Done No 2024-07-25
178 4 TLW 1 1 1 Done Not Done Done Done Done No 2024-07-25
179 5 AG 1 1 1 Done Not Done Done Done Done No 2024-07-25
180 5 BRN 1 1 1 Done Not Done Done Done Done No 2024-07-25
181 5 CDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
182 5 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
183 5 FTP 1 1 1 Done Not Done Done Done Done No 2024-07-25
184 5 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-29
185 5 KHR 1 1 1 Done Not Done Done Done Done No 2024-07-25
186 5 KSP 1 1 1 Done Not Done Done Done Done No 2024-07-25
187 5 MKS 1 1 1 Done Not Done Done Done Done No 2024-07-25
188 5 MST 1 1 1 Done Not Done Done Done Done No 2024-07-25
189 5 MZW 1 1 1 Done Not Done Done Done Done No 2024-07-25
190 5 NDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
191 5 NDR-A 1 1 1 Done Not Done Done Done Done No 2024-07-25
192 5 NDR-C 1 1 1 Done Not Done Done Done Done No 2024-07-25
193 5 RK 1 1 1 Done Not Done Done Done Done No 2024-07-25
194 5 RWB 1 1 1 Done Not Done Done Done Done No 2024-07-25
195 5 RWD 1 1 1 Done Not Done Done Done Done No 2024-07-25
196 5 SBN 1 1 1 Done Not Done Done Done Done No 2024-07-25
197 5 SRW 1 1 1 Done Not Done Done Done Done No 2024-07-25
198 5 TLW 1 1 1 Done Not Done Done Done Done No 2024-07-25
199 644 RD 2 2 2 Done Not Done Done Done Done No 2024-07-25
200 650 RD 2 2 2 Done Not Done Done Done Done No 2024-07-25
201 654 RD 1 1 1 Done Not Done Done Done Done No 2024-07-25
202 6 AG 1 1 1 Done Not Done Done Done Done No 2024-07-25
203 6 BRN 1 1 1 Done Not Done Done Done Done No 2024-07-25
204 6 CDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
205 6 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
206 6 FTP 1 1 1 Done Not Done Done Done Done No 2024-07-25
207 6 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
208 6 KHR 1 1 1 Done Not Done Done Done Done No 2024-07-25
209 6 KSP 1 1 1 Done Not Done Done Done Done No 2024-07-25
210 6 MZW 1 1 1 Done Not Done Done Done Done No 2024-07-25
211 6 NDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
212 6 RWB 1 1 1 Done Not Done Done Done Done No 2024-07-25
213 6 RWD 1 1 1 Done Not Done Done Done Done No 2024-07-25
214 6 SBN 1 1 1 Done Not Done Done Done Done No 2024-07-25
215 6 SLW 3 3 3 Done Not Done Done Done Done No 2024-07-29
216 6 SRW 1 1 1 Done Not Done Done Done Done No 2024-07-25
217 7 AG 1 1 1 Done Not Done Done Done Done No 2024-07-25
218 7 CDR 1 1 1 Done Not Done Done Done Done No 2024-07-29
219 7 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
220 7 FTP 1 1 1 Done Not Done Done Done Done No 2024-07-25
221 7 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
222 7 KHR 1 1 1 Done Not Done Done Done Done No 2024-07-25
223 7 KSP 1 1 1 Done Not Done Done Done Done No 2024-07-29
224 7 MKS 1 1 1 Done Not Done Done Done Done No 2024-07-25
225 7 MZW 1 1 1 Done Not Done Done Done Done No 2024-07-25
226 7 RWD 1 1 1 Done Not Done Done Done Done No 2024-07-25
227 7 SBN 1 1 1 Done Not Done Done Done Done No 2024-07-25
228 7 SRW 1 1 1 Done Not Done Done Done Done No 2024-07-25
229 8 AG 1 1 1 Done Not Done Done Done Done No 2024-07-25
230 8 CDR 1 1 1 Done Not Done Done Done Done No 2024-07-25
231 8 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
232 8 FTP-A 1 1 1 Done Not Done Done Done Done No 2024-07-25
233 8 FTP-B 1 1 1 Done Not Done Done Done Done No 2024-07-25
234 8 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
235 8 KHR 1 1 1 Done Not Done Done Done Done No 2024-07-25
236 8 MKS 1 1 1 Done Not Done Done Done Done No 2024-07-25
237 8 MZW 1 1 1 Done Not Done Done Done Done No 2024-07-25
238 8 RWD 1 1 1 Done Not Done Done Done Done No 2024-07-25
239 8 RWD-A 1 1 1 Done Not Done Done Done Done No 2024-07-25
240 8 SBN 1 1 1 Done Not Done Done Done Done No 2024-07-25
241 8 SLW 1 1 1 Done Not Done Done Done Done No 2024-07-25
242 9 AG 1 1 1 Done Not Done Done Done Done No 2024-07-25
243 9 CDR 3 3 3 Done Not Done Done Done Done No 2024-07-25
244 9 DBL 1 1 1 Done Not Done Done Done Done No 2024-07-25
245 9 FTP 1 1 1 Done Not Done Done Done Done No 2024-07-25
246 9 GGR 1 1 1 Done Not Done Done Done Done No 2024-07-25
247 9 KHR 1 1 1 Done Not Done Done Done Done No 2024-07-25
248 9 KSP 1 1 1 Done Not Done Done Done Done No 2024-07-25
249 9 MKS 1 1 1 Done Not Done Done Done Done No 2024-07-25
250 9 RWD 1 1 1 Done Not Done Done Done Done No 2024-07-25
251 9 SLW 1 1 1 Done Not Done Done Done Done No 2024-07-25
252 BHURANPURA BARANI 1 1 1 Done Not Done Done Done Done No 2024-07-25
253 KHERWALA BARANI 2 2 2 Done Not Done Done Done Done No 2024-07-25
254 SHEODANPURA BARANI 1 1 1 Done Not Done Done Done Done No 2024-07-25