Map Digitization Status - Physical Progress

State/UT: RAJASTHAN ,
District Name: HANUMANGARH
Tehsil Name: Hanumangarh
S.No. Village Name Total No. of Mapsheets/ FMBs/ Tippans Total No. of Mapsheets/ FMBs/ Tippans in good condition No. Of Mapsheets/ FMBs/ Tippans Digitized Spatial Data verified Are Cadastral Maps Geo-Referenced Are Cadastral Maps linked With ROR Are Cadastral Maps simultaneously updated with Bhu-Naksha used for Cadastral Maps Other software used for Cadastral Maps Status Entry Date Remark
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
1 10 DLP 1 1 1 Done Done Done Done Done No 2022-05-11
2 10 HMH 1 1 1 Done Not Done Done Done Done No 2022-05-11
3 10 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-11
4 10 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-11
5 10 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-17
6 10 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-11
7 10 MD-A 1 1 1 Done Not Done Done Done Done No 2022-05-11
8 10 MD-B 1 1 1 Done Not Done Done Done Done No 2022-05-11
9 10 MD-C 1 1 1 Done Not Done Done Done Done No 2022-05-11
10 10 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-11
11 10 MOD 1 1 1 Done Not Done Done Done Done No 2022-05-11
12 10 MWM 1 1 1 Done Not Done Done Done Done No 2022-05-11
13 10 MZW 1 1 1 Done Not Done Done Done Done No 2022-05-11
14 10 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-11
15 10 RP-A 1 1 1 Done Not Done Done Done Done No 2022-05-11
16 10 RP-B 1 1 1 Done Not Done Done Done Done No 2022-05-11
17 10 SSW-A 1 1 1 Done Not Done Done Done Done No 2022-05-11
18 10 SSW-B 1 1 1 Done Not Done Done Done Done No 2022-05-11
19 10 STG 1 1 1 Done Not Done Done Done Done No 2022-05-11
20 11 DLP 1 1 1 Done Not Done Done Done Done No 2022-05-11
21 11 HMH 1 1 1 Done Not Done Done Done Done No 2022-05-11
22 11 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-11
23 11 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-11
24 11 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-11
25 11 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-16
26 11 MD 1 1 1 Done Not Done Done Done Done No 2022-05-16
27 11 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-16
28 11 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-16
29 11 RP 1 1 1 Done Not Done Done Done Done No 2022-05-16
30 11 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-16
31 11 STG 1 1 1 Done Not Done Done Done Done No 2022-05-16
32 12 HMH 1 1 1 Done Not Done Done Done Done No 2022-05-16
33 12 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-16
34 12 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-16
35 12 KSP-A 1 1 1 Done Not Done Done Done Done No 2022-05-16
36 12 KSP-B 1 1 1 Done Not Done Done Done Done No 2022-05-16
37 12 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-16
38 12 MD 1 1 1 Done Not Done Done Done Done No 2022-05-16
39 12 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-18
40 12 NDR-A 1 1 1 Done Not Done Done Done Done No 2022-05-16
41 12 NDR-B 1 1 1 Done Not Done Done Done Done No 2022-05-16
42 12 RP 1 1 1 Done Not Done Done Done Done No 2022-05-16
43 12 STG 1 1 1 Done Not Done Done Done Done No 2022-05-16
44 13 HMH (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-16
45 13 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-16
46 13 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-16
47 13 KSP-A 1 1 1 Done Not Done Done Done Done No 2022-05-16
48 13 KSP-B 1 1 1 Done Done Done Done Done No 2022-05-16
49 13 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-16
50 13 MD 1 1 1 Done Not Done Done Done Done No 2022-05-16
51 13 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-16
52 13 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-18
53 13 RP 1 1 1 Done Not Done Done Done Done No 2022-05-16
54 13 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-16
55 13 STG 1 1 1 Done Not Done Done Done Done No 2022-05-16
56 14 AG 1 1 1 Done Not Done Done Done Done No 2022-05-16
57 14 HMH (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-16
58 14 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-16
59 14 JRK-A 1 1 1 Done Not Done Done Done Done No 2022-05-16
60 14 JRK-B 1 1 1 Done Not Done Done Done Done No 2022-05-16
61 14 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-16
62 14 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-16
63 14 MD 1 1 1 Done Not Done Done Done Done No 2022-05-16
64 14 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-16
65 14 MWM 1 1 1 Done Not Done Done Done Done No 2022-05-16
66 14 NDR-CAD 1 1 1 Done Not Done Done Done Done No 2022-05-16
67 14 NDR-CAD (RAHIT) 1 1 1 Done Not Done Done Done Done No 2022-05-16
68 14 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-16
69 14 STG 1 1 1 Done Not Done Done Done Done No 2022-05-16
70 15 AG 1 1 1 Done Not Done Done Done Done No 2022-05-16
71 15 HMH (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-16
72 15 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-16
73 15 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-16
74 15 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-16
75 15 LLW-A 1 1 1 Done Not Done Done Done Done No 2022-05-16
76 15 LLW-B 1 1 1 Done Not Done Done Done Done No 2022-05-16
77 15 MD 1 1 1 Done Not Done Done Done Done No 2022-05-16
78 15 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-16
79 15 NDR-A 1 1 1 Done Not Done Done Done Done No 2022-05-16
80 15 NDR-B 1 1 1 Done Not Done Done Done Done No 2022-05-16
81 15 RP 1 1 1 Done Not Done Done Done Done No 2022-05-16
82 15 SSW-A 1 1 1 Done Not Done Done Done Done No 2022-05-16
83 15 SSW-B 1 1 1 Done Not Done Done Done Done No 2022-05-16
84 15 STG-A 1 1 1 Done Not Done Done Done Done No 2022-05-16
85 15 STG-B 1 1 1 Done Not Done Done Done Done No 2022-05-16
86 16 AG 1 1 1 Done Not Done Done Done Done No 2022-05-16
87 16 HMH (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-16
88 16 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-16
89 16 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-16
90 16 LLW-A 1 1 1 Done Not Done Done Done Done No 2022-05-16
91 16 LLW-B 1 1 1 Done Not Done Done Done Done No 2022-05-16
92 16 MD 1 1 1 Done Not Done Done Done Done No 2022-05-16
93 16 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-16
94 16 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-16
95 16 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-16
96 16 STG 1 1 1 Done Not Done Done Done Done No 2022-05-16
97 17 AG 1 1 1 Done Not Done Done Done Done No 2022-05-16
98 17 HMH (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-16
99 17 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-16
100 17 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-16
101 17 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-16
102 17 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-16
103 17 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-16
104 17 STG 1 1 1 Done Not Done Done Done Done No 2022-05-16
105 18 AG 1 1 1 Done Not Done Done Done Done No 2022-05-16
106 18 HMH (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-16
107 18 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-16
108 18 LLW-A 1 1 1 Done Not Done Done Done Done No 2022-05-16
109 18 LLW-B 1 1 1 Done Not Done Done Done Done No 2022-05-16
110 18 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-18
111 18 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-16
112 18 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-16
113 18 STG 1 1 1 Done Not Done Done Done Done No 2022-05-16
114 19 AG 1 1 1 Done Not Done Done Done Done No 2022-05-16
115 19 HMH 1 1 1 Done Not Done Done Done Done No 2022-05-16
116 19 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-16
117 19 KSP (KISHANPURA) 1 1 1 Done Not Done Done Done Done No 2022-05-16
118 19 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-16
119 19 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-16
120 19 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-16
121 19 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-16
122 19 STG 1 1 1 Done Not Done Done Done Done No 2022-05-16
123 1 ARW 1 1 1 Done Not Done Done Done Done No 2022-05-16
124 1 AWSM 1 1 1 Done Not Done Done Done Done No 2022-05-16
125 1 BPM 1 1 1 Done Not Done Done Done Done No 2022-05-16
126 1 BPSM 1 1 1 Done Not Done Done Done Done No 2022-05-16
127 1 C 1 1 1 Done Not Done Done Done Done No 2022-05-16
128 1 CS 1 1 1 Done Not Done Done Done Done No 2022-05-16
129 1 DBL-A 1 1 1 Done Not Done Done Done Done No 2022-05-16
130 1 DBL-B 1 1 1 Done Not Done Done Done Done No 2022-05-16
131 1 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-16
132 1 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-16
133 1 KKW 1 1 1 Done Not Done Done Done Done No 2022-05-16
134 1 KNJ (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-16
135 1 KWD 1 1 1 Done Not Done Done Done Done No 2022-05-16
136 1 KWM 1 1 1 Done Not Done Done Done Done No 2022-05-16
137 1 LGW 1 1 1 Done Not Done Done Done Done No 2022-05-16
138 1 LK 1 1 1 Done Not Done Done Done Done No 2022-05-16
139 1 M 1 1 1 Done Not Done Done Done Done No 2022-05-16
140 1 MOD 1 1 1 Done Not Done Done Done Done No 2022-05-16
141 1 MW 1 1 1 Done Not Done Done Done Done No 2022-05-16
142 1 MWM 1 1 1 Done Not Done Done Done Done No 2022-05-16
143 1 NWN 1 1 1 Done Not Done Done Done Done No 2022-05-16
144 1 R 1 1 1 Done Not Done Done Done Done No 2022-05-16
145 1 RP 1 1 1 Done Not Done Done Done Done No 2022-05-16
146 1 SNM 1 1 1 Done Not Done Done Done Done No 2022-05-16
147 1 STB 1 1 1 Done Not Done Done Done Done No 2022-05-16
148 1 STD 1 1 1 Done Not Done Done Done Done No 2022-05-16
149 1 STG (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-16
150 1 UTS 1 1 1 Done Not Done Done Done Done No 2022-05-16
151 1 ZWD 1 1 1 Done Not Done Done Done Done No 2022-05-16
152 20 AG 1 1 1 Done Not Done Done Done Done No 2022-05-17
153 20 HMH 1 1 1 Done Not Done Done Done Done No 2022-05-17
154 20 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-17
155 20 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-17
156 20 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-17
157 20 NDR-A 1 1 1 Done Not Done Done Done Done No 2022-05-17
158 20 NDR-B 1 1 1 Done Not Done Done Done Done No 2022-05-17
159 20 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
160 20 STG 1 1 1 Done Not Done Done Done Done No 2022-05-17
161 21 AG 1 1 1 Done Not Done Done Done Done No 2022-05-17
162 21 HMH-A 1 1 1 Done Not Done Done Done Done No 2022-05-17
163 21 HMH-B 1 1 1 Done Not Done Done Done Done No 2022-05-17
164 21 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-17
165 21 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-17
166 21 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-17
167 21 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-17
168 21 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
169 22 HMH 1 1 1 Done Not Done Done Done Done No 2022-05-17
170 22 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-17
171 22 LLW-A 1 1 1 Done Not Done Done Done Done No 2022-05-17
172 22 LLW-B 1 1 1 Done Not Done Done Done Done No 2022-05-17
173 22 MJD 1 1 1 Done Not Done Done Done Done No 2022-05-17
174 22 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-17
175 22 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-17
176 22 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
177 23 HMH 1 1 1 Done Not Done Done Done Done No 2022-05-17
178 23 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-17
179 23 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-17
180 23 MJD 1 1 1 Done Not Done Done Done Done No 2022-05-17
181 23 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-17
182 23 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-17
183 23 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
184 24 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-17
185 24 LLW-A 1 1 1 Done Not Done Done Done Done No 2022-05-17
186 24 LLW-B 1 1 1 Done Not Done Done Done Done No 2022-05-17
187 24 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-17
188 24 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-17
189 24 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
190 25 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-17
191 25 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-17
192 25 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-17
193 25 NDR-A 1 1 1 Done Not Done Done Done Done No 2022-05-17
194 25 NDR-B 1 1 1 Done Not Done Done Done Done No 2022-05-17
195 25 SSW 1 1 1 Done Done Done Done Done No 2022-05-17
196 26 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-17
197 26 NDR-A 1 1 1 Done Not Done Done Done Done No 2022-05-17
198 26 NDR-B 1 1 1 Done Not Done Done Done Done No 2022-05-17
199 26 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
200 27 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-17
201 27 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-17
202 27 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-17
203 28 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-17
204 28 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-17
205 28 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-17
206 28 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
207 29 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-17
208 29 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-17
209 29 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-17
210 29 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
211 2 AM 1 1 1 Done Not Done Done Done Done No 2022-05-17
212 2 ARW 1 1 1 Done Not Done Done Done Done No 2022-05-17
213 2 AWSM 1 1 1 Done Not Done Done Done Done No 2022-05-17
214 2 C 1 1 1 Done Not Done Done Done Done No 2022-05-17
215 2 DBL 1 1 1 Done Not Done Done Done Done No 2022-05-17
216 2 HLM 1 1 1 Done Not Done Done Done Done No 2022-05-17
217 2 HMH 1 1 1 Done Not Done Done Done Done No 2022-05-17
218 2 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-17
219 2 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-17
220 2 KKW 1 1 1 Done Not Done Done Done Done No 2022-05-17
221 2 KNJ 1 1 1 Done Not Done Done Done Done No 2022-05-17
222 2 KWM 1 1 1 Done Not Done Done Done Done No 2022-05-17
223 2 LK 1 1 1 Done Not Done Done Done Done No 2022-05-17
224 2 M 1 1 1 Done Not Done Done Done Done No 2022-05-17
225 2 MOD-A 1 1 1 Done Not Done Done Done Done No 2022-05-17
226 2 MOD-B 1 1 1 Done Not Done Done Done Done No 2022-05-17
227 2 MW 1 1 1 Done Not Done Done Done Done No 2022-05-17
228 2 MWM-A 1 1 1 Done Not Done Done Done Done No 2022-05-17
229 2 MWM-B 1 1 1 Done Not Done Done Done Done No 2022-05-17
230 2 NWN (RURAL) 2 2 2 Done Done Done Done Done No 2022-05-11
231 2 PBN 1 1 1 Done Not Done Done Done Done No 2022-05-17
232 2 R 1 1 1 Done Not Done Done Done Done No 2022-05-17
233 2 RRW 2 2 2 Done Not Done Done Done Done No 2022-05-11
234 2 SNM (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-17
235 2 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
236 2 STD 1 1 1 Done Not Done Done Done Done No 2022-05-17
237 2 STG 1 1 1 Done Not Done Done Done Done No 2022-05-17
238 2 UMW 1 1 1 Done Not Done Done Done Done No 2022-05-17
239 30 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-17
240 30 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-17
241 30 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-17
242 30 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
243 31 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-17
244 31 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-17
245 31 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-17
246 31 SSW (FATEHGARH) 1 1 1 Done Not Done Done Done Done No 2022-05-17
247 32 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-17
248 32 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-17
249 32 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-17
250 32 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
251 33 MMK 1 1 1 Done Not Done Done Done Done No 2022-05-17
252 33 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
253 34 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
254 35 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-17
255 35 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
256 36 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
257 37 NGC 1 1 1 Done Not Done Done Done Done No 2022-05-17
258 37 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
259 38 NGC 1 1 1 Done Not Done Done Done Done No 2022-05-17
260 38 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
261 39 NGC 1 1 1 Done Not Done Done Done Done No 2022-05-17
262 39 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
263 3 ARW 1 1 1 Done Not Done Done Done Done No 2022-05-18
264 3 AWSM-A 1 1 1 Done Not Done Done Done Done No 2022-05-18
265 3 AWSM-B 1 1 1 Done Not Done Done Done Done No 2022-05-18
266 3 BPM 1 1 1 Done Not Done Done Done Done No 2022-05-18
267 3 BPSM 1 1 1 Done Not Done Done Done Done No 2022-05-18
268 3 DBL 1 1 1 Done Not Done Done Done Done No 2022-05-18
269 3 HLM 1 1 1 Done Not Done Done Done Done No 2022-05-18
270 3 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-18
271 3 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-18
272 3 KKW-A 1 1 1 Done Not Done Done Done Done No 2022-05-18
273 3 KKW-B 1 1 1 Done Not Done Done Done Done No 2022-05-18
274 3 KNJ (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-18
275 3 KWM 1 1 1 Done Not Done Done Done Done No 2022-05-18
276 3 LK 1 1 1 Done Not Done Done Done Done No 2022-05-18
277 3 MOD 1 1 1 Done Not Done Done Done Done No 2022-05-18
278 3 MW 1 1 1 Done Not Done Done Done Done No 2022-05-18
279 3 MWM 1 1 1 Done Not Done Done Done Done No 2022-05-18
280 3 NWN 1 1 1 Done Not Done Done Done Done No 2022-05-18
281 3 PBN 1 1 1 Done Not Done Done Done Done No 2022-05-18
282 3 RP 1 1 1 Done Not Done Done Done Done No 2022-05-18
283 3 RRW-A 1 1 1 Done Not Done Done Done Done No 2022-05-18
284 3 RRW-B 1 1 1 Done Not Done Done Done Done No 2022-05-18
285 3 SNM 1 1 1 Done Not Done Done Done Done No 2022-05-18
286 3 STD 1 1 1 Done Not Done Done Done Done No 2022-05-18
287 3 STG 1 1 1 Done Not Done Done Done Done No 2022-05-18
288 3 UMW-A 1 1 1 Done Not Done Done Done Done No 2022-05-18
289 3 UMW-B 1 1 1 Done Not Done Done Done Done No 2022-05-18
290 3 UTS 1 1 1 Done Not Done Done Done Done No 2022-05-18
291 40 NGC 1 1 1 Done Not Done Done Done Done No 2022-05-17
292 40 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
293 41 NGC 1 1 1 Done Not Done Done Done Done No 2022-05-17
294 41 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
295 42 NGC 1 1 1 Done Not Done Done Done Done No 2022-05-17
296 42 SSW 2 2 2 Done Not Done Done Done Done No 2022-05-11
297 43 NGC 1 1 1 Done Not Done Done Done Done No 2022-05-17
298 43 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
299 44 NGC (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-17
300 44 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
301 45 NGC 1 1 1 Done Not Done Done Done Done No 2022-05-17
302 45 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-17
303 46 NGC (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-17
304 47 NGC (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-17
305 48 NGC (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-17
306 49 NGC (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-17
307 4 ARW 1 1 1 Done Not Done Done Done Done No 2022-05-18
308 4 ARW-A 1 1 1 Done Not Done Done Done Done No 2022-05-18
309 4 AWSM 1 1 1 Done Not Done Done Done Done No 2022-05-18
310 4 HLM 1 1 1 Done Not Done Done Done Done No 2022-05-18
311 4 HLM-A 1 1 1 Done Not Done Done Done Done No 2022-05-18
312 4 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-18
313 4 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-18
314 4 KKW 1 1 1 Done Not Done Done Done Done No 2022-05-18
315 4 LK 1 1 1 Done Not Done Done Done Done No 2022-05-18
316 4 MOD 1 1 1 Done Not Done Done Done Done No 2022-05-18
317 4 MW 1 1 1 Done Not Done Done Done Done No 2022-05-18
318 4 MWM-A 1 1 1 Done Not Done Done Done Done No 2022-05-18
319 4 MWM-B 1 1 1 Done Not Done Done Done Done No 2022-05-18
320 4 PBN 1 1 1 Done Not Done Done Done Done No 2022-05-18
321 4 RRW 1 1 1 Done Not Done Done Done Done No 2022-05-18
322 4 SNM 1 1 1 Done Not Done Done Done Done No 2022-05-18
323 4 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-18
324 4 STG 1 1 1 Done Not Done Done Done Done No 2022-05-20
325 4 UTS 1 1 1 Done Not Done Done Done Done No 2022-05-20
326 50 NGC (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-20
327 51 NGC (RURAL) 1 1 1 Done Not Done Done Done Done No 2022-05-20
328 55/56 RD 1 1 1 Done Not Done Done Done Done No 2022-05-20
329 5 ARW-A 1 1 1 Done Not Done Done Done Done No 2022-05-20
330 5 ARW-B 1 1 1 Done Not Done Done Done Done No 2022-05-20
331 5 AWSM 1 1 1 Done Not Done Done Done Done No 2022-05-20
332 5 HMH 1 1 1 Done Not Done Done Done Done No 2022-05-20
333 5 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-20
334 5 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-20
335 5 KKW 1 1 1 Done Not Done Done Done Done No 2022-05-20
336 5 KNJ 1 1 1 Done Not Done Done Done Done No 2022-05-20
337 5 LK 1 1 1 Done Not Done Done Done Done No 2022-05-20
338 5 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-20
339 5 MD 1 1 1 Done Not Done Done Done Done No 2022-05-20
340 5 MOD 1 1 1 Done Not Done Done Done Done No 2022-05-20
341 5 MW 1 1 1 Done Not Done Done Done Done No 2022-05-20
342 5 MWM-A (MAINAWALI) 1 1 1 Done Not Done Done Done Done No 2022-05-20
343 5 MWM-B 1 1 1 Done Not Done Done Done Done No 2022-05-20
344 5 RP 1 1 1 Done Not Done Done Done Done No 2022-05-20
345 5 SSW (JHAMBAR) 1 1 1 Done Not Done Done Done Done No 2022-05-20
346 5 UTS 1 1 1 Done Not Done Done Done Done No 2022-05-20
347 6 HMH 1 1 1 Done Not Done Done Done Done No 2022-05-20
348 6 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-20
349 6 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-20
350 6 KKW 1 1 1 Done Not Done Done Done Done No 2022-05-20
351 6 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-20
352 6 MD-A 1 1 1 Done Not Done Done Done Done No 2022-05-20
353 6 MD-B 1 1 1 Done Not Done Done Done Done No 2022-05-20
354 6 MOD 1 1 1 Done Not Done Done Done Done No 2022-05-20
355 6 MWM-A 1 1 1 Done Not Done Done Done Done No 2022-05-20
356 6 MWM-B 1 1 1 Done Not Done Done Done Done No 2022-05-20
357 6 RP 1 1 1 Done Not Done Done Done Done No 2022-05-20
358 6 SNM 1 1 1 Done Not Done Done Done Done No 2022-05-20
359 6 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-20
360 6 STG 1 1 1 Done Not Done Done Done Done No 2022-05-20
361 6 UTS 1 1 1 Done Not Done Done Done Done No 2022-05-20
362 7 DLP 1 1 1 Done Not Done Done Done Done No 2022-05-20
363 7 HMH 1 1 1 Done Not Done Done Done Done No 2022-05-20
364 7 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-20
365 7 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-20
366 7 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-20
367 7 MD 1 1 1 Done Not Done Done Done Done No 2022-05-20
368 7 MOD 1 1 1 Done Not Done Done Done Done No 2022-05-20
369 7 MWM 1 1 1 Done Not Done Done Done Done No 2022-05-20
370 7 NDR-A 1 1 1 Done Not Done Done Done Done No 2022-05-20
371 7 NDR-B 1 1 1 Done Not Done Done Done Done No 2022-05-20
372 7 RP-A 1 1 1 Done Not Done Done Done Done No 2022-05-20
373 7 RP-B 1 1 1 Done Not Done Done Done Done No 2022-05-20
374 7 RPC 1 1 1 Done Not Done Done Done Done No 2022-05-20
375 7 SNM 1 1 1 Done Not Done Done Done Done No 2022-05-20
376 7 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-20
377 7 STG 1 1 1 Done Not Done Done Done Done No 2022-05-20
378 7 UTS 1 1 1 Done Not Done Done Done Done No 2022-05-20
379 8 DLP 1 1 1 Done Not Done Done Done Done No 2022-05-20
380 8 HMH 1 1 1 Done Not Done Done Done Done No 2022-05-20
381 8 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-20
382 8 KSP 1 1 1 Done Not Done Done Done Done No 2022-05-20
383 8 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-20
384 8 MD 1 1 1 Done Not Done Done Done Done No 2022-05-20
385 8 MOD 1 1 1 Done Not Done Done Done Done No 2022-05-20
386 8 MWM 1 1 1 Done Not Done Done Done Done No 2022-05-20
387 8 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-20
388 8 RP-CAD(RAHIT) 1 1 1 Done Not Done Done Done Done No 2022-05-20
389 8 RP-CAD(SAHIT) 1 1 1 Done Not Done Done Done Done No 2022-05-20
390 8 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-20
391 8 STG-A 1 1 1 Done Not Done Done Done Done No 2022-05-20
392 8 STG-B 1 1 1 Done Not Done Done Done Done No 2022-05-20
393 9 DLP 1 1 1 Done Not Done Done Done Done No 2022-05-20
394 9 HMH 1 1 1 Done Not Done Done Done Done No 2022-05-20
395 9 JDW 1 1 1 Done Not Done Done Done Done No 2022-05-20
396 9 JRK 1 1 1 Done Not Done Done Done Done No 2022-05-20
397 9 LLW 1 1 1 Done Not Done Done Done Done No 2022-05-20
398 9 MD 1 1 1 Done Not Done Done Done Done No 2022-05-20
399 9 MOD 1 1 1 Done Not Done Done Done Done No 2022-05-20
400 9 MWM 1 1 1 Done Not Done Done Done Done No 2022-05-20
401 9 MZW 1 1 1 Done Not Done Done Done Done No 2022-05-20
402 9 NDR 1 1 1 Done Not Done Done Done Done No 2022-05-20
403 9 RP 1 1 1 Done Not Done Done Done Done No 2022-05-20
404 9 SSW 1 1 1 Done Not Done Done Done Done No 2022-05-20
405 9 STG 1 1 1 Done Not Done Done Done Done No 2022-05-20